tlement at the base under a fill height of 183 ft. is 0.01 ft. No. 2 was placed on weathered rock, and settlement at the base under a fill height of 117 ft. had reached 0.21 ft. in November 1964.

Aluminium casings were installed in the embankment for measuring lateral movements with a slope in- dicator. Unfortunately, this instru- ment went out of service soon after coming into use. However, a settle- ment torpedo similar in principle to the U.S.B.R. torpedo enabled the internal vertical movements of each section of the casing to be measured.

оп

Surface settlement points and de- flection points were constructed each of the downstream berms as well as on the dam crest.

No ap- preciable surface settlement or deflec- tion has yet been recorded.

Summary

Approximately 1.6 million cu. yd. of materials were required to con- struct the Lower Shing Mun Main Dam which is a composite rock-and earth-fill embankment. Cost of this embankment is HK$15 million.

The earthfill used was completely decomposed granite which was ob tained from the hills nearby. Because of its abundance in Hong Kong, its high shear strength when properly compacted, and its good workability,

CIVIL ENGINEERING & PUBLIC WORKS

decomposed granite has been proved to be eminently suitable for earth dam construction.

were

The consulting engineers Binnie & Partners, London, and Scott & Wilson, Kirkpatrick & Part- ners, Hong Kong. The main contrac- tor was Nishimatsu Construction

Company Ltd.. Japan, and

the

transport sub-contractor was Oriental Development Co., Ltd., Hong Kong.

References

1.

2.

3.

RUXTON, B. P. & BERRY, D. (1957). Weathering of Granite and Associated Erosional Fea- tures in Hong Kong. (Geological Society of America, Bulletin Volume 68, pp. 1263-1292). LAMB, D.W. (1962). Decompos- ed Granite as Fill Material, with Particular Reference to Earth Dam Construction. (Sym- posium of Hong Kong Soils, Hong Kong Joint Group of The Institutions of Civil, Mechanical and Electrical Engineers, 1962). Bishop, A. W. Kennard, M. F., & PENMAN, A. D. M. Pore Pres- sure Observations at Selset Dam, (Proceedings of the Conference on Pore Pressure and Suction in Soils, London, 1960).

5.

BISHOP, A. W. (1957). Some Factors Controlling the Pore Pressures set up during the Con- struction of Earth Dams. (Pro- ceedings of the 4th Internation- al Conference on Soil Mechanics and Foundation Engineering, London 1957).

APPENDIX

Contractor's Plant for Embankment Construction

No.

Plant

3

D8 Bulldozer,

Caterpillar

2

B8U Bulldozer,

Caterpillar

2

D7 Bulldozer,

Caterpillar

6

Use

977 Traxcavator,

Caterpillar,

21⁄2 cu. yd.

955 Traxcavator,

Caterpillar

134 cu. yd.

Main dam, quarries borrow areas and access roads.

Main dam and quarries

PRESSURES

( X 1,000 LB PER SQ.FT.)

24

23

2차

31

20

19

17

16

15

14

נן

12

11

10

9

A

2

Motor Grader, Caterpillar

Main dam & access roads

4.

"Earth Manual" U.S. Depart- ment of the Interior Bureau of Reclamation.

2

38B Face Shovel,

Ruston Bucyrus, 11⁄2 cu. yd.

1

Face Shovel, Smith,

34 cu. yd.

Filter plant

and quarries

END OF CONSTRUCTIO

1

Truck Crane, Smith,

Main dam

25 tons

and others

1

Self-propelled

pneumatic-tyred

roller, Sakai, 22

tons

PIEZONETER

1

Vibrating steel roller,

Vibra-Verken,

4 tons

ABOVE PIEZOMETER

1

Vibrating pneumatic-

1

tyred roller, Japan į Machinery, 10 tons

Pneumatic-tyred

roller, Southwest,

40 tons (On hire

Main dam

compaction

OVERBURDEN PRES

OVERBURDEN PRESSURE

ABOVE

from P.W.D.)

PORE PRESSURE

1

Vibrating Wacker-

Plate

'

2

2

Vibrating Soil Com.

PORE PRESSURE CS

pactor, Shinwa

Kikai Kogy

с

4

Johnson Rammer

- 1

- 2

1964

'OCT1NOV'DEC! JAN'FEB MAR APR MAY JUN JUL AUG' SEP 'OCT NOV DEC | JAN |

1963

1964

5

Dump Truck, Foden,

1965

11 cu. yd.

110

901

9 8 2 8 2

Quarries and

19

Dump Truck, Isuzu,

main dam

6 cu. yd.

55

CI

50

40

3

C5

30

20

19

'OCT ' NOV' DEC❘ JAN' FEB 'MAR' APR MAY JUN 'JUL' AUG' SEP 'OCT NOV DEC | JAN

1963 1964

1964 1965

1

and access

roads

Filter Plant, 75

ton/hr.

End Tipping Lorries, Borrow areas

(hired locally)

Water Tanker, Isuzu, Main dam

1300 gal.

and Main

dam

Main dam

Crushing Plant, 50

ton/hr.

PORE PRESSURE

OVERBURDEN PRESSURE (%)

Fig. 7. Pore pressure recorded by piezometers C1 and C5 with relation to construction

Far East Architect & Builder December, 1965