SINGAPORE RURAL BOARD
Owner
Architect
Address
Tanah Merah Kechil
Jalan Eunos
Lorong Tukang Dua
Jalan Jurong Kechil Phillips Avenue
Greenfield Drive Ronggol Road
Aida Street Carmen Street
Loron Tukang Satu
Woodlands Road 121⁄2 m.
Malaysia Land Univestment
Co. Ltd.
Md. Basalamah Fatimah
Bte Mohammed
Chuah Yet Lian
Robert F. N. Kan
Hercules Rubber & Chemical George K. C. Ho
Co. Ltd.
Jurong Park Ltd.
Lee Hee Huat & others
Lakhpatrai Sharma
Heng Ann Realty Co. Sin Chew Realty Ltd. Sulaiman Sulaimi Singapore Essential Oils
Distillation Ltd. Union Ltd.
Ho Yut Choon
M. S. Chung
Ng Chee Sen
Ee Hoong Chwee & Co. Low Ah Long Wee Soo Bee S. S. Tan
Li Hock Hung
Description
Six shops & flats
Six single-storey shops
Factory
Housing development (86 dwellings) Pair of two-storey semi-detemined
houses
Pair of two-storey semi-detd. houses. 44 bungalows
Two two-storey bungalows Two storey residence Factory.
Pepsi Cola plant & office.
Contracts awarded
Construction of secondary_lining Lion Rock Tunnel. $355,832
Fabrication and delivery to site of two blow down vessels with vent and syphon pipe work for Lai Chi Kok incinerator plant. $22,490
HONG KONG GOVERNMENT
Acme Metal Works
Chung Wah Engineer- ing Co.
Reconstruction of catchoit to Braemar Ping Kee Construction reservoir spillway. $93,320
Co.
Supply and laying of vitreous floor Grand Traders, Ltd. tiles at Kennedy Town abattoir, Hong Kong. $572,474
Construction of Kapok Drive from new Government Office Building to Helena May Institute. $1,020,600
Green Island Cement Co. Ltd.
Construction of culvert from Tin Hau Yau Wing Co. Ltd. Temple Road to Healthy Street East.
$885,742.
Construction of Government low cost Yeu Shing Construc- housing blocks 1-6 and estate schools tion Co.
1 and 2 at Kwai Chung, Area 9.
$14,797,282.
Construction of resettlement housing Dah Cheng & Co. block 7 at Shek Lei, Area C. $2,676,876
Construction of main seawall at Wan Yau Wing Co. Ltd. Chai reclamation, stage II, section N-
6A. $1,317,775
Construction of roads, drains and sur- Chi Fuk Construction faces for Shek Lei low cost housing tion Co. estate. $228,787
Founda-
Piling to foundations for blocks 4 and The Vibro Piling & 5 and portions of blocks 2 and 6 at International Kwai Chung North, Government low tion Co. Ltd. cost housing area 9. $492,360
Electric En- gineering Co.
Supply and installation of 6 passenger Ryoden lifts in blocks 7 and 8, Shek Lei re- settlement estate. $406,900
Construction of sea outfall and cul- Ching Hing Construc- vert in Healthy Street East. $1,199,841 tion Co. Ltd. Construction of a 24-bed rural clinic Fook Lee & Co. and maternity home at Castle Peak,
N.T. $928,631
Construction of main drainage for Wah Sang Lee Construction Fu Estate, Stage 1. $445,744
Co. Ltd.
Culverting of Albany Nullah between Sang Lee Construction Helena May Institute and Kennedy Co. Ltd. Road and formation of slip roads.
$514,549
Improvement works to stream course Ping Kee Construction and culvert from Ming Yuen Western Co. Street to Tin Hau Temple Road.
$111,470
Electrical installation at Kennedy The China Engineers Town abattoir, Hong Kong. $597,800 Ltd.
Construction of Prince Edward Road The Express Transport
intercepting sewer "A", stage 1. & Building Contractors
$669,685
Far East Architect & Builder April, 1967
Ltd.
Decking of Wong Nei Chong Nullah Yau Wing Co. Ltd. from Jockey Club to Leighton Hill
Road. $528,194
Supply of metal windows for Cheung Crittall-Hope Sha Wan abattoir. $1,130,701 (£16,- 293-16-6d.) f.o.b. London
Supply of aluminium air intake louvres Colt Ventilation for Cheung Sha Wan abattoir. $123,232 (£7,702-1-0d.)
Supply of flush doors for resettlement estates. $523,325; $104,036; $171,385
(i). Dah Cheng & Co. (ii). Tat Cheng Hong (iii). E. Hop Fat & Co. Construction of concrete footpath at Tung Cheung Con- Sai Lau Kok, Tsuen Wan. $13,890 struction Co. Construction of concrete stream Yuen Fong Construc- bunds at Shui Hau, South Lantau. tion Co. $20,300
Construction of an aqua privy at Tai Tung Cheung Con- Ping, North Lamma. $17,750
struction Co.
Construction of children's playground Tai Hing Construction at Kwei Tei Village, Sha Tin. $18,905 & Engineering Co. Improvement to drainage channelling Tung Cheung Con- at Lo Wai Village, Tsuen Wan. $11,997 struction Co. Construction of a U.S.D. refuse trailer Cheng Tai compound at Sham Shui Po Market, tion Co. Kowloon. $20,020
Construc-
Demolition of site formation for new Wing Shing Construc- convalescent block at Kowloon Hos- tion Co.
pital. $45,081
Re-instatement of landslip at Chater T. K. Shen Construc- Hall Flats, Hong Kong. $179,874 tion Co.
Sinking of 1 No. borehole well at Ta The Hong Kong Well Kwu Ling Park, Phase I, Kowloon. Boring & Engineering $16,190
Co.
Supply and laying of mastic asphalt Precast Products Ltd. roofing to Block 1, Ngau Tau Kok
resettlement housing, Kowloon.
$15,859
Supply of metal windows, doors & China Steel Works Ltd. flyscreens & burglar bars for depart-
mental quarters at Au Tau, New Ter- ritories. $79,873
Electrical installation at staff training The
British General
school & prison officers' quarters, Electric Co., Ltd.
$70,800 Stanley Prison, Hong Kong.
1966-67 annual contract for supply and Riggs Venetian Blind repair of asphalt, vinyl and vinyl Co. asbestos floor tiling. $131,272
Supply and laying of mastic asphalt Precast Products Ltd. roofing to Block F Extension (Area
"B") Ham Tin Resettlement Housing, Kowloon. $26,333
Supply and laying of mastic asphalt Precast Products Ltd. roofing to Blocks 42 and 43, Sau Mau
Ping resettlement housing (Stage II), Kowloon. $26,273
67