Estimates-1970 — Page 204

Estimates 財政預算 All

198

Head 63-PUBLIC WORKS NON-RECURRENT: WATERWORKS

Accumu- Revised

Pro- gramme No.

Approved project estimate

lative estimated Estimate expenditure expenditure 1969-70

to 31.3.68 for 1968-69

$

$

$

$

Sub-

head

Kowloon and New Kowloon-Contd.

22 Kowloon South Salt Water Flushing|

System Stage I

WK26

900,000

93,626

410,000

57,000

23 Kowloon West Salt Water Flushing

System....

WK27

3,250,000

138,306

740,000

1,150,000

24 Trunk Supply Mains: Kowloon East WK28 25 Ham Tin Fresh Water High Level

4,600,000

2,513,528

640,000

25,000

Supply

WK29

4,000,000

9,347

5,000

26 Salt Water Flushing System, Sau Mau

Ping

WK30

2,400,000

316,440

330,000

800,000

27 Kowloon Bay Reclamation--Section

A, Supply

WK31

670,000

10,000

4,630,000

3,717,000

New Territories

28 Castle Peak Supply, Raw Water Feed. WNI 29 Plover Cove Scheme:

8,000,000

(1) Stages I and II Works

WN10 | and 11

(2) Consulting Engineers' fees and

expenses

4,850,588 2,400,000 250,000

541,000,000 468,297,753 19,180,000 12,000,000 (520,000,000)

37,000,000 34,431,504 2,568,000 (31,500,000)

1,000

30 River Indus Flood Pumping Scheme WN12

31 Shek Pik Scheme

28,840,000 25,959,832

900,000

1,300,000

(24,000,000)

WN14

263,560,000 |262,818,007

270,000

227,000

|(248,016,000)|

32 Sheung Shui-Tai Po Supply, Stage II. WN16

11,000,000 9,993,426

580,000 186,000

(9,000,000)

33 Tsing Lung Tau Unfiltered Supply 34 Tung Chung Scheme

WN17

850,000

WN21

33,500,000

759,250 29,659,217

70,000

19,000

150,000

250,000

35 Yuen Long Balance Tank and

Pipeline

WN22

3,200,000 1,334,689 700,000

850,000

(2,250,000)

36 Yuen Long Water Supply

WN35

1,370,000

300,000

1,070,000

37 Tsuen Wan/Kwai Chung Develop-

ment Supply

WN38

72,000,000 21,025.824

4,000,000

1,500,000

38 East River-Shum Chun Scheme

WN39

4,524,000 4,303,812

150,000

40,000

39 Cheung Chau Water Supply, Stage III WN40 40 Sha Tin Trunk Main

1,200,000

390,000

580,000

WN44

3,000,000

402,163

1,140,000

120,000

41 Castle Peak Supply, Stage IA

WN46

15,400,000

242,511

2,000,000 2,815,000

42 Uprating of Sha Tin Treatment Works

and Pumping Station and Tai Po Tau Pumping Station

WN48

13,850,000

300,000

530,000

4,000,000

(6,000,000)

43 Tai Po Ting Kok Water Supply 44 Pat Heung Water Supply

WN49

900,000

245,000 350,000

WN50

280,000

250,000

30,000

45 Sai Kung Town Water Supply 46 Extension of Sha Tin Treatment

WN51

2,316,000

800,000

Works and Pumping Station and extension of Tai Po Tau Pumping Station

WN52

51,600,000

500,000

1,700,000

47 Provision of Temporary Increased

Pumping Capacity at Sha Tin

Treatment Works

WN53

160,000

30,000

130,000

48 Extension of Mains Water Supplies to

Villages in the Yuen Long and

Tai Po Districts

WN54

3,560,000

300,000

49 | Raising of Plover Cove Dam

21,700,000

25,000

1,000,000

36,378,000

29,518,000