Estimates-1970 — Page 199

Estimates 財政預算 All

Head 62-PUBLIC WORKS NON-RECURRENT: CIVIL ENGINEERING 193

Accumu- Revised

Pro-

Approved lative estimated Estimate gramme project

expenditure expenditure 1969-70 No. estimate

to 31.3.68 for 1968-69

$

New Territories-Contd.

Sub- head

Roads and Bridges-Contd.

141 South Lantau Road, Stage III 142 Tai Wan-Ma On Shan Road,

Stage I (Tai Wan to Kei Ling Ha Lo Wai)

NR29

4,300,000

20,000

500,000

NR34

3,000,000 (4,000,000)

24,619

20,000 500,000

143 Tai Wai, Roads and Drainage 144 Tsuen Wan (North), Roads and

Drains

NR35

2,824,800 752,375

85,000

70,000

NR39

11,140,000 2,515,082 (7,550,000)

2,700

5,000

145 Tsuen Wan (South), Roads and

Drainage

NR40

11,500,000 8,567,078 450,000 (7,500,000)

300,000

146 Kwai Chung Industrial Area 27,

Final Surfacing of Roads

NR51

2,300,000

500,000

147 | Road to Junk Bay, Stage I (Lei Yue

Mun Road to Sau Mau Ping)

NR52

2,800,000

795,058 1,100,000

180,000

148 Yuen Long, Roads and Drains,

Stage I

NR53

5,000,000 3,128,430

400,000

30,000

149 Tai Po Market Central Area, Roads

and Drains

NR58

3,965,000 2,969,851

77,000

30,000

(3,145,000)

150 Tsuen Wan West Bus Terminus

NR59

700,000

228,298

412,000

10,000

151 Castle Peak Road/Lei Muk Road/

Kwai Chung Road Junction

NR63

730,000

239,026

328,000

10,000

152 Junk Bay Road, Stage I, Phase II

(Sau Mau Ping to Anderson Road) NR67

4,600,000

15,000

50,000

153 Luk Keng-Tai Mei Tuk Road,

Stage I (from Tai Mei Tuk to

Chung Mei)

NR68

2,000,000

1,775,000

50,000

154 Footbridge at Castle Peak Road near

Tai Wo Hau

NR71

225,000

231

100,000

60,000

155 Access Road to Fo Tan

NR72

650,000

150,000

320,000

156 Access Road to Ha Kwai Chung New Village from Kwai Chung Area 29A Road System

NR78

170,000

120,000

5,000

157 Access Road from Tai Wai Village to Sha Tin Valley Nullah Road

NR79

322,000

100,000

158 South Lantau Road Widening, Stage

II (Cheung Sha to Shui Hau), Phase I

NR91

500,000

250,000

159 Castle Peak Road, Dual Carriageway (Tsuen Wan to Castle Peak) Stage 1 --Investigation, Preliminary Report, Consultants' Fees and Reimbursements

NR92

850,000 728,733 (650,000)

50,000

5,820,210

5,328,800

Drainage

160 Kwai Chung Development, Areas 17

and 29 (part), Drainage and Roads

ND2

7,400,000 5,615,948 480,000 200,000 (4,600,000)

161 Kwai Chung Industrial Areas 27, 28 and 29 (part), Drainage and Roads

ND3

8,200,000 6,969,064 (4,125,000)

130,000

200,000

162 Yuen Long Flood Control: Stage IV ND7 163 Yuen Long Intercepting Sewers and

10,500,000

9,391,530

20,000

Sewage Disposal, Stage I

ND 10

9,500,000 1,606,540

150,000

164 Kwai Chung Development, Areas 10B

and 10E (part), Roads and Drainage

ND16

4,350,000 1,880,824

5,000

165 Tsuen Wan Area 8, Roads and

Drainage Additional Resite Area ND17

166 Kwai Chung Offensive Trades Area

26A, Roads and Drainage Works

ND18

1,150,000

(800,000)

1,500,000 278,862

929,836

5,000

5,000