178 Head 62–PUBLIC WORKS NON-RECURRENT: CIVIL ENGINEERING

Accumu- Revised

Sub- head

New Territories—Contd.

Drainage

154 Kwai Chung Development, Areas 17

and 29 (part), Drainage and Roads

Pro-

No.

Approved gramme project

estimate

$

$

lative estimated Estimate expenditure expenditure 1968-69

to 31.3.67 for 1967-68

$

69

ND2

7,400,000 5,283,764

272,000 550,000

155 Kwai Chung Industrial Areas 27,

28 and 29 (part), Drainage and Roads

ND3

8,200,000 6,761,030

220,000

230,000

156 Yuen Long Flood Control:

(1) Stage I

ND4

5,700,000 5,687,070

10,000

(2) Stage II

ND5

3,200,000

2,218,144

20,000

40,000

(3) Stage III

! ND6

1,500,000 1,083,189

50,000

70,000

(4) Stage IV

ND7

10,500,000

9,391,530

30,000

5,000

(5) Stage V and Shan Ha Road

ND8

4,200,000

3,375,515

53,000

30,000

157 Yuen Long Intercepting Sewers and

Sewage Disposal, Stage I .....

ND10

9,500,000

1,557,313

75,000

250,000

158 Kwai Chung Development, Areas 10B and 10E (part), Roads and Drainage

ND16

4,350,000

1,865,180

16,000

5,000

159 Tsuen Wan Area 8, Roads and

Drainage-Additional Resite Area ND17

1,150,000

693,000

237,000

50,000

160 Kwai Chung Offensive Trades Area

26A, Roads and Drainage Works ... ND18

1,500,000

134,351

145,000

50,000

161 Sewage Disposal: Northern New

Territories:

(1) General Investigations

ND19

120,000 120,000

(2) Shek Wu Hui Sewage Disposal

Investigations ....

ND21

44,000

42,498

(3) Site Investigations

ND19

and

ND21

50,000

50,000

162 Sewage Treatment Works at Pillar

Island-Site Formation

ND23

1,600,000

750,000

163 Kwai Chung Intercepting Sewer

Extension

ND24

3,000,000

300,000

700,000

164 Shing Mun River Flood Control

Scheme, Stage I

ND25

1,750,000

245,000

520,000

780,000

165 Shing Mun River Flood Control

Scheme, Stage II

ND26

3,500,000

1,650,000

166 Hydrological Survey of Tolo Harbour ND30

320,000

1,938,000

5,220,000

Port Works

167 Shuen Wan Typhoon Shelter

NP6

168 Pier at Ap Chau, Sha Tau Kok NP9 169 Minor Ferry Service Piers at Yau Kom!

5,500,000 350,000

368,262

580,000

800,000

300,000

Tau on the Mainland and Tsing Yi Island

NP31

385,000

100,000

140,000

170 Landing Facilities at Tathong

NP36

380,000

300,000

680,000

1,540,000

Development

171 Development Schemes:

(1) Consulting Engineers' fees and

reimbursements including

Resident Engineers' Staff

(2) Kwai Chung Reclamation:

Construction

(3) Kwai Chung Reclamation:

Resumptions

172 Kwai Chung North Development,

Area 9, Stage I

173 Tsuen Wan Reclamation, Stage I

174

Sha Tin New Town, Stage I

175 Castle Peak New Town, Stage IA:

(1) Construction

(2) Resumptions

NDE3

9,500,000 9,041,523 187,000 63,000

NDE3 130,000,000| 67,413,404 2,000,000 1,550,000

NDE3 10,000,000 8.626.193

475.000 200,000

NDE4 22,000,000 8,264,131 1,960,000 NDE9 15,000,000 8,914,468 NDE16 300,000,000

950,000

5,000!

255,000

75,416

53,000

1,300,000

NDE17 52,000,000 NDE17

2,500,000

1,304,405 5,253

2,000,000

230,000 1,920,000

8,440,000

6,910,000

14,678,000