Estimates-1968 — Page 261

Estimates 財政預算 All

Appendix VI- Contd.

Project

255

Date of Inclusion

ROADS AND BRIDGES

INR47 Lam Tei Road

63/1

*NR48 Improvements of Bend at M.S. 104, Castle Peak Road

63/1

*NR49 Realignment of Tai Po Road at M.S. 121

63/3

NR55 Footbridge at Sha Tin

64/3

*NR56 Roadworks on Gin Drinker's Bay Dump

65/APR

NR61 Improvements to Access Road at Tau Pass

66/2

NR65 Footpath along Jockey Club Road from Fan Garden to San Fung Avenue, Shek Wu Hui

66/2

NR66 Junction of Castle Peak Road/Tai Ho Road

66/2

NR69 Footpath along Castle Peak Road from San Wai to Chuk Yuen

66/3

NR70 Footbridge at Tai Lam Chung (Cedric Bridge)

66/3

NR74 Minor Improvements to Anderson Road

66/3

NR76 Footpath along Tai Po Road from Wo Hop Shek to Fanling Roundabout NR77 Footbridge and Footpath at Tai Po Road (Bailey Bridge)

66/3

66/3

DRAINAGE

ND13 Cheung Chau, Drainage and Roads

62/3

*ND14 Peng Chau (Silver Mine Bay) Roads and Drains

62/3

*ND15 Sai Kung Roads and Drains

62/3

ND22 Stormwater Drain and Protective Railings near Junction of Route I and Tai Po Road

66/1

PORT WORKS

*NP13 Improvements to Pier at 13 M.S., Castle Peak Road *NP15 Boom at Gin Drinker's Bay Refuse Dump *NP16 Light Beacon below Castle Peak Road, 15 M.S. *NP17 Navigational Light at Shek Kok Tsui, Lamma Island *NP18 Mooring Facilities at Gin Drinker's Bay Refuse Dump *NP19 Widening of Peng Chau Pier

*NP20 Light Beacons-Silver Mine Bay and Datum Rock

*NP21

*NP23

NP24

Removal of Ma Yan Pai (Junk Rock), Long Harbour Silverstrand Beach Seawall

Sha Lo Wan Pier (North West Lantau)

NP26 Cha Am Pai Beacon

NP29

Demolition of Ngai Kap Pai Reef

NP30 Marine Navigational Aids-Pillar Marker-Yin Pai NP32 Winch Hauled Trolley and Track, Waglan Island

* Completed Items

+ Deleted Items

NR47

Transferred to C

63/2

63/2

62/JUN

62/3

64/APR

64/1

66/MAR

64/2

64/3

64/3

65/3

66/1

66/2

66/3

WATERWORKS

HONG KONG ISLAND

No.

Project

A

B

C

WHI

Aberdeen Water Supply---Stage I

66/3

62/3

60/3

WH2

Central City Distribution System

63/1

WH3

Chai Wan Distribution System

63/1

WH4

Chung Hom Kok Fresh Water Supply

62/3

62/2

WH5

Conduit Road Service Reservoir

61/1

WH6

Eastern Extension Service Reservoir

64/3

64/1

63/3

WH7

Kennedy Road Service Reservoir

64/APR

63/3

*WH8

North Point/Shau Kei Wan Supply, Stage II

62/1

60/3

WH9

Improved Supplies to Middle Gap, Black's Link, Shouson Hill and the

62/3

Ridge, Stage II

WH10 Improved Supplies to Middle Gap, Black's Link, Shouson Hill and the

62/3

Ridge, Stage III

:

WH11 Improved Supplies to Mount Cameron and Magazine Gap, Stage II †WH12 North Point/Shau Kei Wan Supply, Stage III

63/3

61/1

59/3

62/1

WH13 North Point (West) Service Reservoir

63/3

WH14 Pok Fu Lam Water Supply, Stage I-Queen Mary Hospital

63/1

62/2

60/3

WH15 Pok Fu Lam Water Supply, Stage II

63/2

60/3

WH16 Shau Kei Wan Service Reservoir

65/3

64/3

63/3

WH17 Stanley and Repulse Bay Supply, Stage II

66/3

60/2

*WH18 Enlargement of Distribution Mains in Stubbs Road Area

WH19 Pumping Main to Victoria Peak

63/2

65/2

61/1

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.