No.
Appendix VI-Contd.
Project
A
B
C
*WK17 | Valley Road Low Cost Housing Water Supply
61/3
WK18 Yau Tong Water Supply Stage II-Extension of Trunk Feed and Con-
struction of Fresh Water Reservoir
62/3
61/1
WK19 Yau Tong Water Supply, Stage III-Construction of Salt Water Pump
House and Reservoir
62/3
61/1
+WK20 Hung Hom Salt Water Flushing System
59/3
WK21 Salt Water Flushing System-Jordan Valley
58/2
WK22 Salt Water Flushing System-Kwun Tong
58/2
WK23 Salt Water Flushing System-Wong Tai Sin (Kai Tak)
58/2
WK24 Kowloon East Salt Water System (Plumping Station and Additional
Mains)
64/2
64/1
63/2
WK25 Kwun Tong/Jordan Valley Salt Water Flushing System
65/1
64/2
WK26 Kowloon South Salt Water Flushing System WK27 Kowloon West Salt Water Flushing System
64/3
64/3
WK28 Trunk Supply Mains--Kowloon East
65/1
64/3
WK29 Ham Tin Fresh Water High Level Supply WK30 Salt Water Flushing System-Sau Mau Ping
WK31 Kowloon Bay Reclamation-Section A, Water Supply
* Completed Items
† Deleted Items
65/2
65/1
65/3
65/1
65/3
NEW TERRITORIES
No.
Project
A
B
C
WNI *WN2
Castle Peak Water Supply, Stage I (Trunk Feed)
65/1
63/2
61/3
Cheung Chau Island Water Supply Extension, Stage I
60/2
59/3
WN3
Cheung Chau Water Supply, Stage II
65/2
65/1
62/2
WN4
Connecting Pipeline-Jubilee Reservoir to Tsuen Wan Filters
59/OCT
†WN5
Kwai Chung Water Supply
61/3
WN6 North Lamma Reservoir
58/3
WN7 Peng Chau Island (Silver Mine Bay) Water Supply, Stage I (Preliminary
62/2
61/3
Investigation)
WN8 Peng Chau (Silver Mine Bay) Water Supply, Stage II
63/1
62/2
61/3
WN9 Ping Chau (Mirs Bay) Water Supply
61/1
60/3
59/3
WN10 Plover Cove Water Scheme, Stage I (Consulting Engineers)
60/3
WN11 Plover Cove Water Scheme, Stage II (Consulting Engineers)
62/1
WN12 River Indus Flood Pumping Scheme
WN13 Sha Tin Water Supply
60/MAR
60/3
WN14 Shek Pik Scheme (Consulting Engineers)
57/MAY
WN15 Sheung Shui-Tai Po Supply, Stage III
63/1
WN16 Sheung Shui-Tai Po Supply, Stage II
63/3
63/1
WN17 Tsing Lung Tau Unfiltered Supply
64/2
63/1
WN18 Tsuen Wan Water Supply
55/3
WN19 Tsuen Wan West Water Supply, Stage I (Preliminary Investigation)
62/3
61/3
WN20 Tsuen Wan West Water Supply, Stage II
61/3
WN21 Tung Chung Water Scheme
63/DEC
WN22 Yuen Long Balance Tank and Pipeline
62/3
*WN23 Western New Territories Supply, Stage II
57/3
56/2
WN24 Castle Peak Salt Water Flushing Supply
63/2
†WN25 Tsuen Wan Salt Water Flushing System, Stage I (Preliminary
Investigation)
62/3
59/3
†WN26 Tsuen Wan Salt Water Flushing System, Stage II
63/1
59/3
WN27 Irrigation Works in the New Territories, Minor Works
57/3
WN34 Castle Peak Water Supply, Stage II
63/2
61/3
WN35 Yuen Long Water Supply
64/3
WN36 Tai Po Salt Water Flushing Supply
64/3
WN37 Tsuen Wan Waterworks Depot
64/3
WN38 Tsuen Wan/Kwai Chung Development-Water Supply
64/3
WN39 East River-Shum Chun Scheme
64/JUN
WN40 Cheung Chau Water Supply-Stage III
65/2
* Completed Items
† Deleted Items