Appendix IV- Contd.
CATEGORY C
(Items considered desirable, the details of which require further consideration or for which no design staff can be made available)
HONG KONG
D.27
Aberdeen and Ap Lei Chau Sewerage Scheme
D.28 Drainage works at Middle and South Bay Beaches
D.29 Shau Kei Wan Sewerage Scheme
D.30 Nullah and Nullah Bridge, Staunton Creek, Aberdeen
D.31
Tin Hau Temple Road Area Development, Roads and Drainage, Stage II D.32 Decking of Wun Sha Street Nullah above Tung Lo Wan Road
NEW TERRITORIES
D.33 Yuen Long Flood Control, Stage IV
D.34 Yuen Long Sewerage Disposal
CATEGORY D
(Items which are estimated to cost less than $100,000 and which could be proceeded with as and when opportunity offers)
HONG KONG
D.35 Deep Water Bay Sewerage Scheme, Stage II
D.36 Stanley Sewerage Scheme, Stage II
D.37 Chai Wan Reclamation-Initial Drainage Works
NEW TERRITORIES
D.38 Cheung Chau, Drainage and Roads
D.39 Peng Chau (Silver Mine Bay), Roads and Drains
D.40 Sai Kung Roads and Drainage
HONG KONG
P.1
P.2
P.3
P.4
P.5
P.6
RECLAMATIONS, PIERS AND DEVELOPMENT
CATEGORY A(i)
(Items under construction at 1st January, 1963)
Aberdeen Reclamation and Typhoon Shelter, Stage I
Aberdeen Harbour Hydrographic Survey (Consulting Engineers)
Hong Kong Harbour Hydrographic Survey (Consulting Engineers)
Vehicular Ferry Piers (North Point to Kowloon City) (Consulting Engineers) Central Reclamation, Stages II and IV
Passenger Ferry Pier at North Point
KOWLOON
P.7
Cheung Sha Wan Reclamation, Stage II
P.8
Hung Hom Reclamation, Stages IIB and IIA and main drainage
P.9
Kai Tak Airport Development (Consulting Engineers)
P.10 Kwun Tong New Town, Reclamation for Industrial Zone 5, Sections C, D & E
P.11 Kwun Tong Road Reclamation
P.12 Kwun Tong New Town, Roads and Drainage for Industrial Zone 5, Section B P.13 To Kwa Wan Reclamation
P.14 Yau Ma Tei Typhoon Shelter, Improvements P.15 Waterloo Road Hill Development, Stage II