Estimates-1964 — Page 132

Estimates 財政預算 All

128

Head 62-PUBLIC WORKS NON-RECURRENT

Estimated Expendi-

Estimate

Revised Estimate

ture to 31st March

1963

Estimate 1963-64

Sub- head

Roads and Bridges—Contd.

220

Tai Wai, Drainage and Roads

2,824,800

760,800

400,000

221

222

223 224

225

Castle Peak Road, Dual Carriageway: Stage II

(Lai Chi Kok Gap to Motion Picture Studio)... Castle Peak Road-Provision of additional ·

carriageway around Lai Chi Kok Hospital...... Castle Peak Road improvements (Chai Wan Kok) Texaco Road improvements, Stage II (Sha Tsui

Road to Cemetery Road)

Lion Rock Tunnel

1,950,000

800,000 1,000,000

1,500,000

1,000,000

2,250,000

3,325

1,000

226

227

228

Bridge at 231 Milestone, Castle Peak Road Ping Shan-Yuen Long, Dual Carriageway Shap Pat Heung Feeder Road widening, Stage I

2,100,000 5,500,000 600,000

2,075,000

25,000

7,500,000

4,500,000 3,000,000 | fn

100,000 500,000

2,400,000

250,000 1,250,000

(Yuen Long Main Road to Kwong Ming School)

500,000

120,000 380,000

229

Sai Kung-Tai Mong Tsai Feeder Road widening,

Stage I (Sai Kung to Tai Wan)

885,000

100,000 785,000

230

Railway crossing at Sha Tin, Stage I (moving

of access road and provision of traffic lights and warning bells)

50,000

36,200

35,700

500

231

Shek Wu Hui, Roads and Drainage, Stage III

800,000

461,000

339,000

232

Tsuen Wan (North), Roads and Drains

7,550,000

500,000

233

Tai Po/Ting Kok Feeder Road widening

2,700,000

1,000,000

234

Motor roads and bridges:

(1) Minor reconstruction

(2) Minor improvements (Street widening, bus

bays and traffic islands)

(3) Footpaths

(4) Parking meters

(5) Pedestrian and vehicular aids

3,000,000

800,000

200,000

596,000

1,005,000

30,507,500

Drainage

235

Hong Kong Central Sewerage Scheme..

4,000,000

1,654,900 1,350,000

236

North Point Sewerage Scheme

3,000,000

2,438,800

350,000

237

Wan Chai Intercepting Sewer and Outfall

3,550,000

1,826,800

1,000

238

Stanley Sewerage Scheme, Stage I

350,000 400,000

70,000

330,000

239

Tin Hau Temple Road Area Development,

Roads and Drainage, Stage I

2,000,000

659,000 1,000,000

240

Culverting of Albany Nullah between Helena

May and Detention Barracks

140,000

140,000

241

Decking of Bowrington Canal

900,000

100,000

800,000

242

Area north of Cornwall Street, Kowloon Tong,

Drainage and Roads

2,500,000

2,740,000

2,370,000

370,000

243

Kowloon Eastern Sewerage Scheme:

(1) Stage II

1,600,000

1,200,000

100,000

(2) Stage III

750,000

50,000

300,000

244

Kwun Tong Sewerage Scheme

5,500,000 6,750,000

2,356,400 1,100,000

245

South Kowloon Peninsula Sewerage Scheme

2,700,000

1,540,000 1,160,000

246

Fung Wong Village Development, Stage II

1,000,000

247

Kai Tak Nullah treatment works..

1,500,000

615,000 385,000

264,900 600,000

248

Kai Tak Nullah improvements (North of Airport)

1,300,000

400,000

800,000

249

Jordan Valley Nullah extension

760,000

760,000

250

Kwai Chung Industrial Areas 27, 28 and 29

(Part), Drainage and Roads

4,125,000

5,250,000

1,317,000 2,570,000

251

Yuen Long Flood Control:

(1) Stage I

(2) Stage II

(3) Stage III

(4) Stage V

4,270,000 5,400,000 2,175,400 2,200,000 2,000,000

1,400,000 950,000 1,500,000 150,000 900,000 1,350,000 2,250,000 600,000 1,070,000

Reclamations, Piers and Development

252

Vehicular Ferry Piers (North Point/Kowloon City)

5,500,000

3,942,000 | 1,095,000

253

Aberdeen Reclamation and Typhoon Shelter:

(1) Stage I

8,000,000

1,500,000 2,500,000

254

Central Reclamation, Stages II and IV

15,000,000

5,518,000 3,500,000

255

Passenger Ferry Pier at North Point

2,100,000

1,400,000

700,000

Subhead 225 This project is partly applicable to the Scheme

provided under Subhead 301(2).

17,686,000