Estimates-1963 — Page 180

Estimates 財政預算 All

174

NEW TERRITORIES

Appendix III- Contd.

R.12 Castle Peak Road Improvements:

(a) Kwai Chung to Chai Wan Kok

(b) Kom Tsun Street to Lai Chi Kok Gap

R.13 South Lantau Road Improvements (Silver Mine Bay to Cheung Sha)

R.14 Texaco Road Improvements, Stage II (Sha Tsui Road to Cemetery Road)

HONG KONG

CATEGORY A(ii)

(Items for which authority has been given to proceed with working drawings and to call for tenders)

R.15 Castle Road/Conduit Road Junction

R.16

Island Road/Stanley Village Road Junction

R.18

Pok Fu Lam Road, Bus Terminus and Petrol Filling Station

R.17 Preliminary development of Military released land, Murray Barracks

Ꭱ.19

Pok Fu Lam Road widening adjoining Hong Kong University Recreation Ground R.20 Victoria Road widening, Stage I (I.L. 6666 to Mount Davis Road)

KOWLOON

R.21

Austin Road widening (Chatham Road to Austin Avenue)

R.22 Boundary Street/Tai Po Road/Cheung Sha Wan Road Junction Improvements R.23 Cheung Sha Wan Road Reconstruction (Tai Po Road to Yen Chau Strect)

Clearwater Bay Road Improvements (Choi Hung Road to Fei Ngor Shan Road) Cox's Road widening

R.24

R.25

R.26

R.27

Lai Chi Kok Road Reconstruction (Ton Kin Street to Yen Chau Street)

Reconstruction and widening of Ma Tau Chung Road (Argyle Street to Sung Wong Toi Road)

R.28 Prince Edward Road/Argyle Street/Ma Tau Chung Road Junction

R.29 Prince Edward Road/Boundary Street Junction

R.30 Yau Tong Development, Roads and Drainage

NEW TERRITORIES

R.31 Castle Peak Road, Dual Carriageway :

(a) Stage I (Motion Picture Studio to Kwai Chung)

(b) Stage II (Lai Chi Kok Gap to Motion Picture Studio)

R.32 Lion Rock Tunnel

R.33 Ping Shan-Yuen Long, Dual Carriageway

R.34 Railway Crossing at Sha Tin, Stage I—moving of access road and provisions of warning bells

Shek Wu Hui, Roads and Drainage, Stage III

R.35

R.36 Tai Wai, Drainage and Roads

R.37

Reconstruction of 2 Humped Bridges at Tai Po Road at Reservoir Bends (M.S. 51)

R.38 Bridge No. 39 at 14 M.S. Tai Po

R.39 Feeder Road from Tsim Bei Tsui to Pak Nai

HONG KONG

CATEGORY B

(Items the planning of which has commenced or may commence during 1962-63)

R.40 Albany Road/Caine Road/Arbuthnot Road Junction

R.41

New Road over Albany Nullah from Queen's Road East to Lower Albert Road R.42 Causeway Road Reconstruction

R.44 Magazine Gap Road Improvements (May Road to Bowen Road)

R.43

Garden Road Improvements

R.45

R.46

Mid Levels/Central Area Link (Glenealy/Upper Albert Road) Branch Road off Island Road at Repulse Bay

R.47 Island Road Widening, Stage II (Staunton Creek to Police Training School Access Road) R.48 Park Road Improvements

R.49 Pok Fu Lam Road Widening, Stage II

R.50 Repluse Bay Road Widening (Bridge over Beach Road) R.51 Repulse Bay Road Widening (Bridge of South Bay Road)

Page 180Page 181

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.