Estimates-1963 — Page 129

Estimates 財政預算 All

Head 64-PUBLIC WORKS NON-RECURRENT

Estimated Expendi-

Estimate

Revised Estimate

Estimate

ture to 31st March.

1962-63

1962

123

Sub-

Roads and Bridges-Contd.

head

197

Preliminary development of Military released

land, Murray Barracks

125,000

60,000

65,000

198

Pok Fu Lam Road, bus terminus and petrol

filling station

200,000

200,000

199

Pok Fu Lam Road widening adjoining Hong

Kong University Recreation Ground

500,000

125,000

375,000

200

Victoria Road widening, Stage I (I.L. 6666 to

Mt. Davis Road).

1,851,000

250,000

201

Airport Perimeter Road..

4,000,000

2,050,000

750,000

202

Kwun Tong Road:

(1) Stage I

(2) Stage III

2,000,000 3,800,000 | 1,350,000 2,600,000

450,000

650,000

150,000

203

Nathan Road reconstruction (Salisbury Road to

Austin Road)

900,000

300,000 600,000

204

Ngau Tau Kok Road widening (from Stage II to

Stage III of Kwun Tong Road)

850,000

550,000 150,000

205

Austin Road widening (Chatham Road to Austin

Avenue)....

450,000

150,000

300,000

206

Boundary Street/Tai Po Road/Cheung Sha Wan

Road junction improvements

400,000

100,000

207

Cheung Sha Wan Road reconstruction (Tai Po

Road to Yen Chau Street)...

950,000

700,000

208

Clearwater Bay Road improvements (Choi Hung

Road to Fei Ngor Shan Road)

220,000

100,000

120,000

209

Cox's Road widening

190,000

2,000

188,000

210

Lai Chi Kok Road reconstruction (Ton Kin

Street to Yen Chau Street)

450,000

450,000

211

Reconstruction and widening of Ma Tau Chung

Road (Argyle Street to Sung Wong Toi Road)...

240,000

240,000

212

Prince Edward Road/Argyle Street/Ma Tau

Chung Road junction ..

1,300,000

100,000 1,200,000

213

Prince Edward Road/Boundary Street junction...

200,000

100,000

100,000

214

Yau Tong Development, Roads and Drainage

2,144,000

500,000 1,000,000

215

Bridge at 14 Milestone, Tai Po Road

1,400,000

1,329,500

6,500

216

Pat Heung Road System, Stage I

1,480,000

1,446,000

34,000

217

Castle Peak Road improvements:

(1) Kwai Chung to Chai Wan Kok

2,250,000

2,018,900

231,100

(2) Kom Tsun Street to Lai Chi Kok Gap..

4,700,000

4,282,500

10,000

(3) Sham Tseng

1,900,000 1,840,000 1,787,000

53,000

(4) Chai Wan Kok

2,250,000

2,335

1,000

218

Texaco Road improvements, Stage II (Sha Tsui

Road to Cemetery Road)

2,100,000

800,000 1,000,000

219

Castle Peak Road, Dual Carriageway:

(1) Stage I (Motion Picture Studio to Kwai

Chung)

600,000

200,000

400,000

(2) Stage II (Lai Chi Kok Gap to Motion

Picture Studio).

1,950,000

500,000

220

Lion Rock Tunnel

5,500,000

1,100,000 3,650,000 fr

221

Ping Shan-Yuen Long, Dual Carriageway

2,400,000

500,000

222

Railway crossing at Sha Tin, Stage I-moving

of access road and provision of traffic lights and warning bells

50,000

35,000

15,000

223

224

Shek Wu Hui, Roads and Drainage, Stage III Tai Wai, Drainage and Roads

800,000

130,000

400,000

2,824,800

380,000

380,000

225

226

228

Reconstruction of two humped bridges on Tai Po Road at Reservoir Bends (51 Milestone)......... Bridge No. 39 at 14 Milestone, Tai Po Road 227 Feeder Road from Tsim Bei Tsui to Pak Nai

Motor roads and bridges:

(1) Minor reconstruction

(2) Minor improvements (street widening, bus

250,000

250,000

120,000

50,000

70,000

2,243,000

900,000 955,000

2,500,000

bays and traffic islands)

(3) Footpaths

(4) Parking meters

800,000

200,000

831,000

(5) Pedestrian and vehicular aids

1,075,000

23,184,600

Subhead 220 This project is partly applicable to the scheme provided under Subhead 292(2). This estimate excludes the cost of services.