APPENDIX VI (A),

PUBLIC WORKS LOAN (1927) ACCOUNT.

Head 1-Waterworks Development.

Sub-head 1-Shing Mun Valley Scheme.

Works

Revised Estimated Cost

Expenditure to 31.12.20

Revised Estimated Expenditure 1930

Estimated Expenditure 1931

$

$

Item (a) Preliminary Works

11,216.34

11,216.34

(b) Reception Reservoirs, Shek Lai Pui Raw Water.....'

164,273.88

164,273.88

(c) Access Road: Tsun Wan Pineapple Pass

122,345.79

122,345.79

(d) Resumptions

520,957.48

182,132.30

290,000.00

(0) 2nd Section Preliminary Works

(c) Filtering Plant and erection

(1) Pipe Line

(g) Pipers Hill Reservoir

(h) Temporary Intake and Conduit

(j) North Conduit

(k) Harbour Pipes

(Tunnels and South Conduit

(m) Miscellaneous

(7) Service Reservoir (Shek Lai Pui)

(p) Byewash Reservoir

(r) Pipe Line (for Item (o) )...

211,000.00

200,048.14

10,000.00

441,035.35

410,122.80

10,000.00

20,000.00

136,699.97

126,699.97

78,209.63

73,209.03

72.028.07

72,028.07

315,244.41

177,032.20

50,000.00

1,073,644.13

1.073,644.13

100.00

100.00

400,000.00

127,155.27

200,000.00

30,000.00

30,000.00

9,118.68

5,000.00

5,000.00

600,000.00

30,829.09

400,000.00

100,000.00

(9) Hong Kong Garden Service Reservoir

400,000.00

211.30

50,000.00

60,000,00

30,000.00

30.000.00

Total

$4,631.815.05

$2,790,227.88

$995,000.00

$235,000.00

Head 2-Aerodrome and Harbour Development. Sub-Hend 1.-Harbour Development.

Works

Total Cost

Expenditure to 81.12.29

Revised Estimated Expenditure 1980

Estimated Expenditure

1931

Item (a) Dredging

$ 450,896.21

F

450,896.21

(b) Harbour Cable

23.958.42

23,958.42

Total

474,854.63

474,854.63

Loss Contribution from Hong Kong & Kowloon

Wharf & Godown Co., Ltd.

58,124.95

58,124.95

Total

$416,729,68

$416,729.68

Sub-Head 2.-Aerodrome.

!

Works

Revised Estimated Cost

Expenditure to 31.12.20

Revised Estimated Expenditure

Estimated Expenditure

1930

1931

Item (a) Resumptions

$ 1,186,250.00

$ 1,158,698.62

$

27,500.00

(b) Formation of reclamation including completion

of sea walls, nullahs, surfacing and drainage... (c) Covering of Nullahs

788,000.00

635,331.63

102,000.00

275,000.00

168,901.48

50,000.00

56,000.00

(d) Slipways

275,000.00

141,688.11

50,000.00

84,000.00

(e) Roads

1

55,000.00

4,542.15

20,000.00

30,000.00

(f) Sheds

150,000.00

30,000.00

Total

2,679,250.00

2,109,161.99

249,500.00

200,000.00

Less Contribution from Imperial Government

(£100,000)

Total

1,052,783.50

692,783.50

$1,626,466.50 $1,416,378.49

$249,500.00

200,000.00