Head 32. KOWLOON CANTON RAILWAY
Head 32. KOWLOON CANTON RAILWAY
Approved Estimate, 1926.
Estimate, 1927.
gh-heads:-
| Personal Emoluments
258,220
264,029
Other Charges
? Advertising.
E-1-7-2 Advertising
1,000
1,000
1,000
1,000
3 Ballast.
E-5-5-4 Ballast
2,250
2,250
Ballast (Fanling Branch)
500
(1)
E-5-8 Central Mechanical Works
750
250 (2)
3,000
3,000
Bridgework.
E-5-4 Bridges...
2,000
2,000
Bridges (Fanling Branch).
200
(1)
2,000
2,200
5 Carriages Repairs.
E-4-3-1 Materials for Repairs and Renewals
17,000
17.000
"
Painting Contract....
2,730
2,730
1+
Running Repairs (Fanling Branch)
400
(1)
19,730
20,130
6 Coal.
E-1-5-3 Coal for Office and Stores
25
E-1-6 Coal for Head Office
250
25 250
E-3-1-2-1 Coal for Locomotives (9,000 tons)................
Coal for locomotives (Fanling Branch)
(365 tons)
142,380
135,000
(3)
5,475
(1)
E-3-1-2-8 Loading Coal
1,260
1.350 (4)
**
Unloading Ashes..
500
500
23
Loading Coal and Unloading Ashes (Fanling
Branch)
80
(1)
144.415
142,680
7 Compensation.
E-1-14 Compeusation
100
100
100
100
8 Conveyance Allowances,
>>
Works.
E-1-7-6 Conveyance Allowance to Storekeeper E-2-8-2 Conveyance Allowance to Traffic Manager
Conveyance Allowance to Relieving Station Masters, Conveyance Allowance to Disabled Clerk Conveyance Allowance to Traffice Inspectors E-5-1-2 Motor Allowance to Engineer of Way and
9 Formation and Line Protection.
90
90
90
90
36
36
144
144
50
50
150
158
(5)
560
568
E-5-2 Earthwork
1,300
1,300
Fencing
750
750
M
Roads Crossings
700
1,000
(5)
**
Earthwork (Fauling Branch)
500
(1)
2.750
3,550
10 Furniture.
E-2-4-2 Fittings and Furnitures
500
500
500
500
Il Goods Wagons Repairs.
E-4-4-1 Materials for Repairs and Renewals
5,500
5,500
"J
Painting Contract
1,170
1,625 (6)
→
Running Repairs (Fanling Branch)
200 (1)
6.670
7,325
Carried forward
438,945
445,082
(1) Fanling Branch Line reopened.
(2) Considered sufficient.
(3) Lower prices.
(4) More Coal to be loaded.
(3) Considered necessary.
(6) Higher prices.
83
No comments yet.
Private notes are available after approval.