86
.HONGKONG ESTIMATES
3.-PUBLIC WORKS EXTRA-
ORDINARY.-Contd.
Brought forward,
COMMUNICATIONS.
114 Roads —
(a.) Metalling and tar painting hilly portion of Lai Chi Kok-Castle Peak and Taipo Roads,
(b) Taipo Market, kerbing and chan-
nelling, &c.,
(c.) Taipo Road,-Widening and im- proving from 5th milestone Shatin,......
(d) Widening eleven bridges,
to
(e.) Surfacing and strengthening those portions of main road running through paddy,
(f) Extension of Roads in Kowloon
Tong Development Area,
(9.) Waterloo Road extension (100 feet¦
wide) Section between Kowloon Boundary to foot of hills S.E. of tunnel (estimate for 150 foot width),
PUBLIC WORKS.
Original Estimate.
Revised
Estimate.
Approved Revised Estimated Estimated Expenditure Expenditure
1924.
1924.
Estimated Expenditure
1925.
7,200,200
30,000
30,000
30,000
5,000
5,000
5,000
30,000
1,000
6,000
10,000
..
10,000
45.000
10.000
20,000
20,000
30,000
50,000
20,000
20,000
5,000
45,000
10,000
18,000
5,000
13,000
5,000
(h.) Fanling to Sha-tau-kok Road,
160,000
60,000
75,000
(i.) Path from Ta Ku Ling to Lin Ma
Hong for patrol purposes,
15,000
(j) Road to Shun Wau,
10,000
10,000
(k.) Taipo Market to Kam Shau,..
8,500
5,000
(1) Widening two bridges at A Tau
and Kum Tsin,
40,000
(m.) Macadamizing Taipo Road between
25,000
25,000
30,000
50,000
30,000
5th and 9th Mile,
(.) Macadamizing road from Fauling
to Sheung Shui Train Halt,
(o.) General Works,
DRAINAGE.
115 Training Nullahs :—
(a.) One side wall and invert of nullah on Eastern side of the Kowloon Tong Development Scheme,
(b.) Kowloon Tong Development Area, connection of stream North of this area to main nullah,
(c.) Shamshuipo, extension of existing Nanchang Street Nullah to Taipo Road,
(d.) General Works,
116 Miscellaneous Drainage Works :-
(a.) Main sewer from Fuk Tsun Heung in a North-easterly direction to Taipo Road,
(b.) Storm water drains from Nan Chang Street Nullah in the direc- tion of Kowloon Tong Village,....... (c.) Kowloon Tong Development
Scheme, Sewers,
70,000
Ma
50,000
50,000
20,000
50,000
5,000
45,000
20,000
10,000
10,000
......
5,000
5,000
5,000
25,000
25,000
25,000
15,000
15,000
5,000
10,000
100,000
25,000
(d.) Kowloon Tong Development Scheme,
portion of Storm Water drains.............
10,000
50,000
200,000
50,000
5,000
75,000
(e.) General Works,
4
20,000
53,000
40,000
Carried forward,....
7,810,200