.HONGKONG ESTIMATES

3.-PUBLIC WORKS EXTRA-

ORDINARY.-Contd.

Brought forward,

COMMUNICATIONS.

114 Roads —

(a.) Metalling and tar painting hilly portion of Lai Chi Kok-Castle Peak and Taipo Roads,

(b) Taipo Market, kerbing and chan-

nelling, &c.,

(c.) Taipo Road,-Widening and im- proving from 5th milestone Shatin,......

(d) Widening eleven bridges,

to

(e.) Surfacing and strengthening those portions of main road running through paddy,

(f) Extension of Roads in Kowloon

Tong Development Area,

(9.) Waterloo Road extension (100 feet¦

wide) Section between Kowloon Boundary to foot of hills S.E. of tunnel (estimate for 150 foot width),

PUBLIC WORKS.

Original Estimate.

Revised

Estimate.

Approved Revised Estimated Estimated Expenditure Expenditure

1924.

1924.

Estimated Expenditure

1925.

7,200,200

30,000

30,000

30,000

5,000

5,000

5,000

30,000

1,000

6,000

10,000

..

10,000

45.000

10.000

20,000

20,000

30,000

50,000

20,000

20,000

5,000

45,000

10,000

18,000

5,000

13,000

5,000

(h.) Fanling to Sha-tau-kok Road,

160,000

60,000

75,000

(i.) Path from Ta Ku Ling to Lin Ma

Hong for patrol purposes,

15,000

(j) Road to Shun Wau,

10,000

10,000

(k.) Taipo Market to Kam Shau,..

8,500

5,000

(1) Widening two bridges at A Tau

and Kum Tsin,

40,000

(m.) Macadamizing Taipo Road between

25,000

25,000

30,000

50,000

30,000

5th and 9th Mile,

(.) Macadamizing road from Fauling

to Sheung Shui Train Halt,

(o.) General Works,

DRAINAGE.

115 Training Nullahs :—

(a.) One side wall and invert of nullah on Eastern side of the Kowloon Tong Development Scheme,

(b.) Kowloon Tong Development Area, connection of stream North of this area to main nullah,

(c.) Shamshuipo, extension of existing Nanchang Street Nullah to Taipo Road,

(d.) General Works,

116 Miscellaneous Drainage Works :-

(a.) Main sewer from Fuk Tsun Heung in a North-easterly direction to Taipo Road,

(b.) Storm water drains from Nan Chang Street Nullah in the direc- tion of Kowloon Tong Village,....... (c.) Kowloon Tong Development

Scheme, Sewers,

70,000

Ma

50,000

50,000

20,000

50,000

5,000

45,000

20,000

10,000

10,000

......

5,000

5,000

5,000

25,000

25,000

25,000

15,000

15,000

5,000

10,000

100,000

25,000

(d.) Kowloon Tong Development Scheme,

portion of Storm Water drains.............

10,000

50,000

200,000

50,000

5,000

75,000

(e.) General Works,

4

20,000

53,000

40,000

Carried forward,....

7,810,200