Following is a list of major EIA reports completed between July and September
1.
2.
3.
4.
5.
6.
Additional Treatment and Water Transfer Facilities for Metropolitan
Area and NENT (Tai Po Treatment Works)
(Water Supplies Department)
Tai Po Development - Formation and Servicing of Area 12 (Part) and 39 Pak Shek Kok
(Territory Development Department)
Proposed 2nd 132 KV Submarine Cable Link to Shekou China (China Light & Power Co Ltd)
Main Drainage Channels for Ngau Tam Mei, Yuen Long and Kam Tin (Territory Development Department)
Strategic Sewage Disposal Scheme Stage I, Principal Collection and Treatment System
(Drainage Services Department)
Proposed Reclamation and Relocation of United Floating Dock, Tsing Yi
(Hong Kong United Dockyards Ltd)
7.
Three Potential Housing Development Sites Sham Tseng, Canton Road, and Hollywood Road.
-
(Housing Branch)
8.
9.
EIA for Site Formation for Packages 1 and 2 in Reserve Zone, Tin Shui Wai
(Territory Development Department)
River Trade Terminal at Tuen Mun Area 38 Environmental Impact Assessment Study
(River Trade Terminal Co Ltd)
Major EIA's that are likely to be completed in the next 12
months from September onwards include:
1.
Main Drainage Channel for Fanling, Sheung Shui and Hinterland (Civil Engineering Department)
2.
Route 16: From West Kowloon to Sha Tin
(Highways Department)
+