9. Lamma Power Station - Navigation Channel; HK Electric Co Ltd
(The Hongkong Electric Company Ltd)
Major EIAs that are likely to be completed in the next 12 months include:
1.
d
2.
3.
4.
5.
6.
7.
8.
9.
Backfilling of Marine Borrow Pits North Lantau and South Tsing Yi, Feasibility Study/EIA
(Civil Engineering Department)
Green Island Cement Manufacturing and Concrete Batching,
Area 17, Southwest Tsing Yi
(Green Island Cement Co Ltd)
Hong Kong Cement / Concrete Batching Plant and Material Storage Facilities at Northwest Tsing Yi Island
(Hong Kong Cement Co Ltd)
Main Drainage Channel for Fanling, Sheung Shui and Hinterland (Civil Engineering Department)
Main Drainage Channels for Ngau Tam Mei, Yuen Long and Kam Tin (Territory Development Department)
Kam Tin By-pass
(Highways Department)
Commercial / Residential Development at Shui Wing Steel Mill Site
in Tseung Kwan O Area 72
(Shui Wing Steel Ltd)
Residential Development at Hong Kong Oxygen Plant Site in
Area 50 & 51, Tseung Kwan O
(Hong Kong Oxygen & Acetylene Co Ltd)
Island West Refuse Transfer Station
(Environmental Protection Department)
10. Route 16: From West Kowloon to Shatin
(Highways Department)