REPLY:
MR PRESIDENT,
1
28
1
WEDNESDAY, NOVEMBER 16, 1994
(A)
WHEN
MECHANICAL VENTILATION SYSTEMS
TRANSPORT EXCHANGES WERE DESIGNED, IT
THE
THEY
IN
COVERED
WAS BELIEVED
WERE ADEQUATE
IN
AMELIORATING
IT WAS
FOUND THAT
THAT POLLUTION PROBLEM IN THESE INTERCHANGES. A RECENT
STUDY,
THE AIR
HOWEVER, IN VERY HIGH
VENTILATION RATES WOULD BE REQUIRED TO ENSURE THAT THE AIR QUALITY OBJECTIVES AT THE WAITING PLATFORMS
COULD
BE MET. THE REQUIRED VENTILATION RATES ARE BEYOND THE CAPACITY OF THE EXISTING SYSTEMS,
(B) THE PILOT PROJECT WILL REQUIRE $3,980,000.
18-MONTH PROJECT VENTILATION SYSTEMS
STILL
SEEKING
ΤΟ
THIS PROJECT.
IT IS AN OF STUDY THE VARIOUS DESIGNS
WE ARE FOR WAITING PLATFORMS.
THE FUNDS FOR ADMINISTRATION WILL CONSIDER APPLYING THE SUCCESSFUL INTERCHANGES. AN DESIGN TO OTHER COVERED TRANSPORT ESTIMATE OF THE TOTAL COST IS NOT AVAILABLE BECAUSE WE HAVE NOT YET DECIDED ON THE DESIGN TO BE ADOPTED.
(C)
(D)
OF THE MORE IS OPTIMISTIC THAT ONE OR GOVERNMENT DESIGNS WILL BE SATISFACTORY. THE MAIN PURPOSE OF THE TO STUDY IS TO CHOOSE THE MOST PRACTICAL OPTION AND COLLECT TECHNICAL DATA AND DETAILS ON THE COSTS OF THE DESIGN.
IN THE INTERIM, WE HAVE ADVISED TRANSPORT COMPANIES TO TURN OFF ENGINES OF IDLE VEHICLES INSIDE THE TRANSPORT INTERCHANGES. PROPERTY MANAGERS ARE ALSO ADVISED TO
THE VENTILATION OPERATE
PEAK TRAFFIC
WHENEVER WE HOPE THE ABOVE MEASURES
DURING
PRACTICABLE.
ALLEVIATE THE PROBLEM.
SYSTEMS TO
HOURS
FULL
CAPACITY
SUCH WOULD HELP
IS
/29
No comments yet.
Private notes are available after approval.