22
FRIDAY, JULY 29, 1994
REVISED FEE FOR RATES/CROWN RENT ENQUIRY
ANNOUNCED TODAY (FRIDAY) RATES OR CROWN RENT ACCOUNT
THE DIRECTOR OF ACCOUNTING SERVICES THE FEE FOR ENQUIRY OF AN OUTSTANDING WOULD BE REVISED FROM $50 TO $55 WITH EFFECT FROM AUGUST 1,
THE INCREASE IS TO RECOVER
THE COSTS
SUCH SERVICE.
1994.
INCURRED IN
PROVIDING
0
HIRAM'S HIGHWAY TO BE IMPROVED
OF
THE STANDARD
THE LINE OF THE HIRAM'S
IMPROVE THE GOVERNMENT IS PROPOSING TO
ALIGNMENT AND SIGHT HORIZONTAL AND VERTICAL HIGHWAY BETWEEN THE PETROL STATION AND PO TUNG ROAD,
THE IMPROVEMENT WORKS WILL PROVIDE A NEW JUNCTION CONNECTING KUNG CREEK WHICH IS TO ROAD 3A TO ACCESS THE RECLAMATION OF SAI PROVIDE LAND FOR A RURAL PUBLIC HOUSING ESTATE.
THE BASIC ROAD WIDTH WILL BE 7.3 METRES WITH WIDENING TO
THE PETROL
AND PROVIDE RIGHT TURN LANES AT
STATION
JUNCTION WITH
ROAD 3A.
THE POSSIBLE ALLOWANCE WILL BE MADE IN THE DESIGN FOR
FUTURE FORMED AS PART OF THE DUALLING OF HIRAM'S HIGHWAY AND THOSE AREAS WORKS WILL BE LANDSCAPED FOR FUTURE IMPROVEMENT WHEN REQUIRED.
DETAILED OF THE PROPOSED WORKS WERE GAZETTED TODAY (FRIDAY).
PLANS OF THE PROPOSED IMPROVEMENT WORKS CAN BE SEEN AT:
* THE CENTRAL AND WESTERN DISTRICT OFFICE, PUBLIC ENQUIRY SERVICE CENTRE, GROUND FLOOR, HARBOUR BUILDING, 38 PIER ROAD, CENTRAL, HONG KONG;
* THE DISTRICT LANDS OFFICE, SAI KUNG, THIRD GOVERNMENT OFFICES BUILDING, 34 CHAN MAN
NEW TERRITORIES; AND
* THE
SAI
KUNG DISTRICT OFFICE, GROUND GOVERNMENT OFFICES BUILDING, 34 CHAN MAN
NEW TERRITORIES.
SAI FLOOR,
KUNG STREET, SAI KUNG,
ANY PERSON WHO WISHES TO OBJECT TO THE WORKS
TO ADDRESS REQUIRED IS
HIS
IN OBJECTION SECRETARY FOR TRANSPORT NOT LATER THAN SEPTEMBER 27.
BOTH,
FLOOR,
KUNG SAI STREET, SAI KUNG,
OR THE USE, OR
ΤΟ WRITING
THE
0
/23
No comments yet.
Private notes are available after approval.