32
SECOND SSDS CONTRACT SIGNED
FRIDAY, APRIL 29, 1994
(FRIDAY) SIGNED A $71 SERVICING AND MAINTENANCE OF STAGE I OF THE STRATEGIC SEWAGE
THE DRAINAGE SERVICE DEPARTMENT TODAY MILLION-CONTRACT FOR THE CONSTRUCTION,
OFFICES TEMPORARY SITE DISPOSAL SCHEME (SSDS).
THE OF
THE CONTRACT, WHICH IS THE SECOND ONE AWARDED UNDER THE SCHEME, SERVICES (PROJECTS WAS SIGNED BY THE ASSISTANT DIRECTOR OF DRAINAGE
MR TSE HON-SUM, AND A AND DEVELOPMENT),
REPRESENTATIVE OF THE CONTRACTOR, TAI HING (ENGINEERS AND BUILDERS) LIMITED.
THE SITE OFFICES WILL BE LOCATED ON STONECUTTERS ISLAND, AND AT WAN, CHAI WAN TSING YI, KWAI CHUNG, TO KWA WAN, KWUN TONG, SHAU KEI AND TSEUNG KWAN 0.
THE CONTRACT ALSO INCLUDES THE PROVISION OF OTHER SERVICES
THE SCHEME. IT WILL RUN THE RESIDENT SITE STAFF SUPERVISING NEXT MONTH UNTIL AUGUST 1998.
FOR
FROM
STAGE I OF THE
KOWLOON
BETWEEN
TSUEN
SSDS IS
WAN
то
AND
COLLECT AND TSEUNG KWAN
TREAT
SEWAGE
FROM
0 AND FROM
THE
NORTH-EASTERN PART OF HONG KONG ISLAND WITH A VIEW TO IMPROVING WATER QUALITY IN VICTORIA HARBOUR.
THE
PROPOSED ROAD WORKS IN TAI PO AND YUEN LONG * * * * *
THE TERRITORY DEVELOPMENT
DEPARTMENT IS PLANNING TO CARRY OUT TO THE FUTURE WATERFRONT
ROAD WORKS IN TAI PO FOR PROVIDING ACCESS PARK AND THE TAI PO INDUSTRIAL ESTATE.
THE ROAD WORKS, WHICH FORM PART OF THE PROGRAMME FOR TAI PO NEW TOWN, ARE SCHEDULED NEXT YEAR.
THE WORKS INVOLVE THE CONSTRUCTION OF:
CONTINUING DEVELOPMENT TO BEGIN IN SEPTEMBER
* ABOUT 900 METRES OF ROADS BETWEEN YUEN SHIN ROAD AND DAI
STREET:
FAT
* A SMALL TRANSPORT TERMINUS WEST OF THE JUNCTION OF YUEN
ROAD AND TING KOK ROAD;
SHIN
YUEN
ΤΟ THE
* ABOUT 600 METRES OF A DUAL TWO-LANE CARRIAGEWAY LINKING
SHIN ROAD AND DAI FAT STREET AS AN ADDITIONAL ACCESS TAI PO INDUSTRIAL ESTATE; AND
* FOOTPATHS, AMENITY AREAS, CYCLE TRACKS AND DRAINAGE NETWORKS.
A NOTICE FOR THE PROPOSED WORKS WAS GAZETTED TODAY (FRIDAY).
/THE PLAN
No comments yet.
Private notes are available after approval.