MONDAY, OCTOBER 11, 1993
14
REALIGNMENT OF ON RAMP TO KWAI CHUNG ROAD
THE GOVERNMENT PROPOSES TO REALIGN ABOUT 200 EXISTING ROAD ON RAMP TO KWAI CHUNG ROAD.
METRES OF THE
THE REALIGNMENT OF THE EXISTING ON RAMP IS ΤΟ FACILITATE THE DEVIATION OF THE EXISTING MTRC TSUEN WAN UP LINE, ASSOCIATED WITH ADVANCE WORKS OF THE AIRPORT RAILWAY, WHICH IS NEAR ROUTE 3 KWAI CHUNG VIADUCT CURRENTLY UNDER CONSTRUCTION.
TSUEN
THE PROPOSED WORKS INCLUDE REALIGNMENT OF AN ELEVATED SECTION OF THE PROPOSED ROUTE 3 LAI KING INTERCHANGE RAMP F JOINING THE WAN BYPASS AND KWAI CHUNG ROAD NORTHBOUND; ASSOCIATED DRAINAGE LANDSCAPING WORKS AND REPROVISIONING OF FOOTWAYS.
WORKS;
CONSTRUCTION OF THIS REALIGNMENT WORKS IS SCHEDULED TO START
EARLY NEXT YEAR AND TO COMPLETE BY MID-1995.
THE PLAN AND SCHEME MAY BE SEEN AT:
*
THE CENTRAL AND WESTERN DISTRICT OFFICE, PUBLIC ENQUIRY SERVICE CENTRE, GROUND FLOOR, HARBOUR BUILDING, 38 PIER ROAD, CENTRAL, HONG KONG;
KWAI TSING DISTRICT
OFFICE, SECOND FLOOR, KWAI HING GOVERNMENT OFFICES BUILDING, 166-174, HING FONG ROAD, KWAI CHUNG, NEW TERRITORIES; AND;
DISTRICT LANDS OFFICE, KWAI TSING, 10TH FLOOR, TSUEN WAN STATION MULTI-STOREY CARPARK BUILDINGS 174-208 CASTLE PEAK ROAD, TSUEN WAN, NEW TERRITORIES.
+
ANY PERSON WHO WISHES TO OBJECT TO THE WORKS OR THE USE, OR BOTH, IS REQUIRED то ADDRESS HIS OBJECTION IN WRITING TO THE SECRETARY FOR TRANSPORT, CENTRAL GOVERNMENT OFFICES, EAST WING, SECOND FLOOR, LOWER ALBERT ROAD, HONG KONG NO LATER THAN DECEMBER 7 DESCRIBING HIS INTEREST AND THE MANNER IN WHICH HE ALLEGES HE WILL
BE AFFECTED BY THE WORKS OF THE USE.
0
FRESH WATER CUT IN SHAM SHUI PO
FRESH WATER SUPPLY TO SOME PREMISES IN SHAM SHUI PO WILL GO OFF FROM 11 PM ON WEDNESDAY (OCTOBER 13) TO 6 AM THE FOLLOWING DAY TO FACILITATE WASTE DETECTION WORK ON WATERMAINS.
THE SUSPENSION WILL AFFECT ALL THE PREMISES BOUNDED BY CHEUNG WAH STREET, PO ON ROAD, CHEUNG FAT STREET AND CASTLE PEAK ROAD.
/15