FRIDAY, JUNE 11, 1993
20
{THURSDAY), THE 19,820 TONNE "STAR TAIWAN COLLIDED WITH FOUR
ABOUT 9.40 PM YESTERDAY LILY" WHICH WAS ARRIVING FROM KAOSHIUNG, BARGES OFF AP LEI CHAU.
ONE OF THE BARGES, "TSING CHAU B4" SANK AFTER THE INCIDENT. A 62-YEAR-OLD MAN WHO WAS ON THE BARGE FELL INTO THE SEA SUBSEQUENTLY RESCUED. HE WAS
AND DISCHARGED FROM
LAST NIGHT.
TREATED
AND WAS HOSPITAL
0
L
DREDGING WORKS FOR FAIRWAY AND DRAINAGE SYSTEM AUTHORISED
AUTHORISATION
THE FOR
GOVERNMENT
TO
SEABED AT
THE GOVERNOR HAS GIVEN DREDGE A FAIRWAY WITHIN AN AREA OF ABOUT 14.49 HECTARES OF THE TYPHOON SHELTER IN TUEN MUN.
ΤΟ PROVIDE ADEQUATE DRAUGHT THE WORKS, REQUIRED LADEN BARGES TO USE THE FUTURE PUBLIC CARGO HANDLING AREA IN WILL START NEXT MONTH AND TAKE NINE MONTHS TO COMPLETE.
AUTHORISATION HAS
FOR FULLY AREA-16,
MEANWHILE,
ALSO BEEN GIVEN FOR THE AN GOVERNMENT TO PERMIT THE PETTERFORD LAND INVESTMENT LIMITED TO USE
LUNG TAU, TSUEN AREA OF ABOUT 6.17 SQUARE METRES OF SEABED AT TSING WAN AS WORKS AREA IN CONNECTION WITH THE LAYING OF EFFLUENT PIPEWORKS.
DISCHARGE
LAYING AN MONTH AND BR
THE WORKS WILL
INCLUDE DREDGING THE SEABED AND EFFLUENT DISCHARGE DRAINAGE SYSTEM. IT WILL START THIS COMPLETED WITHIN THREE MONTHS.
DESCRIBED (FRIDAY).
AFFECTED BY THE TWO PROJECTS THE EXTENT OF THE AREAS
IN SEPERATE NOTICES OF
GAZETTED AUTHORISATIONS
WERK TODAY
RIGHT OR EASEMENT ANY PERSON WHO CONSIDERS THAT HIS INTEREST,
BY THE IN OR OVER THE FORESHORE AND SEABED INVOLVED WILL BE AFFECTED
DIRECTOR OF BUILDINGS AND WORKS MAY DELIVER A WRITTEN CLAIM TO THE LANDS FOR COMPENSATION BY JUNE 11 NEXT YEAR.
LANDS THEY
PLANS CAN BR SEEN OR THE NOTICES TOGETHER WITH THE RELATED
THE BUILDINGS AND BOUGHT AT THE SURVEY AND MAPPING OFFICE OF DEPARTMENT, 14TH FLOOR, MURRAY BUILDING, GARDEN ROAD, HONG KONG. CAN ALSO BE SEEN AT THE DISTRICT OFFICES CONCERNED.
/21
No comments yet.
Private notes are available after approval.