-
19
FRIDAY, NOVEMBER 2, 1990
THE TENANCY IS FOR TWO-AND-A-HALF THEREAFTER.
THE TENDER DOCUMENTS OF THE TENDER PLAN INSPECTED AT, THE DISTRICT 10TH FLOOR, YAU MA TEI CAR PARK
KOWLOON AND THE BUILDINGS AND LANDS BUILDING, GARDEN ROAD, HONG KONG.
YEARS,
RENEWABLE QUARTERLY
LOT MAY BE OBTAINED FROM, AND LANDS OFFICE, KOWLOON EAST, BUILDING, 250 SHANGHAI STREET, DEPARTMENT, 14TH FLOOR, MURRAY
THE DEADLINE FOR TENDER SUBMISSION IS NOON ON NOVEMBER 16.
AGRICULTURAL LOTS IN TUEN MUN TO BE RESUMED
*
THE GOVERNMENT IS TO RESUME 10 PRIVATE AGRICULTURAL LOTS IN TUEN MUN TO MAKE WAY FOR THE CONSTRUCTION OF A DRAINAGE CHANNEL SYSTEM AT SO KWUN WAT TSUEN WHICH IS PROGRAMMED TO START IN EARLY 1991.
RESUMPTION OF THE LOTS, WITH A TOTAL AREA OF ABOUT 642.9 SQUARE METRES, IS REQUIRED NOW IN ORDER TO ALLOW THE PUBLIC WORKS ΤΟ BEGIN ON TIME AFTER THE THREE MONTHS' RESUMPTION NOTICE HAS EXPIRED.
A NOTICE ON THE RESUMPTION WAS PUBLISHED IN THE GOVERNMENT GAZETTE TODAY (FRIDAY).
A SECTION OF KOK CHEUNG STREET IN MONG KOK TO BE RESUMED AND REBUILT
**
THE HIGHWAYS DEPARTMENT PROPOSES TO RESUME AND RECONSTRUCT A SECTION OF KOK CHEUNG STREET BETWEEN IVY STREET AND FUK CHAK STREET IN MONG KOK.
THIS SECTION OF KOK CHEUNG STREET
IS, AT PRESENT, A POORLY MAINTAINED AND MANAGED PRIVATE STREET WHICH GIVES RISE TO ENVIRONMENTAL AND ACCESS PROBLEMS.
IT IS THEREFORE NECESSARY, FOR PUBLIC INTEREST, ΤΟ RESUME IT FOR PROPER MAINTENANCE AND USE.
THE PROPOSED WORKS WILL COMPRISE THE RECONSTRUCTION CARRIAGEWAYS, FOOTWAYS, AND RELATED DRAINAGE IMPROVEMENT WORKS.
OF
/THE WORKS
Page 20Page 21
No comments yet.
Private notes are available after approval.