XN000022-1990-04-25 — Page 26

Daily Information Bulletin 新聞公報 All

WEDNESDAY, APRIL 25, 1990

25

TRAFFIC ARRANGEMENTS IN EASTERN

THE TRANSPORT DEPARTMENT ANNOUNCES THAT THE SECTION OF WHARF ROAD BETWEEN ITS JUNCTION WITH NORTH POINT ROAD AND A POINT ABOUT 135 METRES WEST OF THE SAME JUNCTION WILL BE RE-ROUTED FROM TWO-WAY TO ONE-WAY EASTBOUND FROM 10 AM ON FRIDAY (APRIL 27).

ON THE OTHER HAND, FROM 8 AM ON FRIDAY, TWO LANES ON BOTH THE EASTBOUND AND WESTBOUND CARRIAGEWAYS OF THE SECTION OF ISLAND EASTERN CORRIDOR OFF TAI ON BUILDING WILL BE CLOSED IN TWO STAGES FOR ABOUT 20 DAYS TO FACILITATE NOISE REDUCTION SURFACING WORKS.

DUE TO RESCHEDULING OF WORK STAGES, THE NOISE SURFACING WORKS ON THE SECTION OF ISLAND EASTERN CORRIDOR POINT ESTATE, WHICH WAS SCHEDULED TO START AT 10 AM ON APRIL BEEN POSTPONED.

REDUCTION OFF NORTH 22, HAS

TEMPORARY URBAN CLEARWAYS IN NORTH POINT

**

THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 9 AM (APRIL 27), THREE SECTIONS OF ROADS IN NORTH POINT WILL BE URBAN CLEARWAYS FROM 7 AM TO 7 PM DAILY FOR ABOUT THREE FACILITATE DRAINAGE WORKS.

THEY ARE:

* SHU KUK STREET BETWEEN JAVA ROAD AND MARBLE ROAD;

ON FRIDAY DESIGNATED MONTHS то

TO A

* THE SOUTHERN KERBSIDE LANE OF JAVA ROAD FROM A POINT ABOUT

40 METRES WEST OF ITS JUNCTION WITH SHU KUK STREET POINT ABOUT 40 METRES EAST OF THE SAME JUNCTION; AND

JUNCTION WEST OF THE

* THE NORTHERN KERBSIDE LANE OF JAVA ROAD FROM ITS

WITH SHU KUK STREET TO A POINT ABOUT 40 METRES SAME JUNCTION.

NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS THERE.

AT THE SAME TIME, THE EXISTING RESTRICTED ZONES FROM 7 AM TO 10 AM AND FROM 4 PM TO 7 PM DAILY ON THE SAME SECTIONS OF SHU KUK STREET AND THE SOUTHERN KERBSIDE LANE OF JAVA ROAD WILL BE CANCELLED.

0

/26

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.