MONDAY, MARCH 5, 1990
10
SIX FARMS COMPLETED WASTE TREATMENT DEMONSTRATION
SIX OF THE DEMONSTRATION PROJECTS
NINE PRIVATE
LIVESTOCK ON
PROJECTS
PARTICIPATING TREATMENT METHODS COMPLETED THE SIX-MONTH DEMONSTRATION PERIOD, MEMBERS OF THE
FARMS PRIVATE DEMONSTRATION ON
FARMS
WASTE
ON
THE HAVE STEERING LEARNT TODAY
IN'
GROUP
(MONDAY).
THIS AFTERNOON, REPRESENTATIVES FROM AT THE GROUP'S MEETING
ON THE THE ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) BRIEFED MEMBERS
VARIOUS TREATMENT METHODS PROGRESS OF THE DEMONSTRATION PROJECTS ON
COMPLY
LIVESTOCK FARMERS
WITH
ANTI-POLLUTION
ΤΟ WHICH CAN ENABLE REQUIREMENTS STIPULATED UNDER THE LIVESTOCK WASTE CONTROL SCHEME.
ON
TREATED SHAN, WHICH JUST COMPLETED ITS COMPLIED MONTH,
WITH THE ANTI-POLLUTION
MEMBERS LEARNT THAT ANALYSIS BY EPD CONFIRMED THAT THE EFFLUENT OF THE PIG FARM IN MA DEMONSTRATION PERIOD LAST REQUIREMENTS.
SATISFIED WITH THE OPERATION OF THE FARM OPERATOR WAS VERY
THE SYSTEM AFTER THE THE HYBRID SYSTEM, AND WOULD CONTINUE TO USE
USE OF DEMONSTRATION PERIOD. THE OPERATOR HAD ALSO SUCCESSFULLY MADE
AN EPD REPRESENTATIVE THE SLUDGE PRODUCED TO FERTILISE FRUIT TREES, ADDED.
ANOTHER PIG FARM
THE PIG-ON-LITTER WASTE TREATMENT SYSTEM IN IN TA KWU LING WAS HANDED OVER TO THE OPERATOR LAST MONTH AND AVAILABLE FOR DEMONSTRATION.
THE
GROUP, MR LEO OF THE STEERING CHAIRMAN
MADE FOR
FARMERS ARE BEING
LIVESTOCK ARRANGEMENTS CONTINUE BUSINESS IN CONTROL AREAS TO VISIT THE FARM TO SYSTEM OPERATES.
IS NOW
SAID KWAN,
TO WHO WISH SEE HOW THE
YUEN
REGISTER THEIR MR KWAN SAID INDIVIDUAL FARMERS ARE WELCOME TO
FARM WITH THE CITY AND NEW TERRITORIES INTEREST IN VISITING THE
DISTRICT, ADMINISTRATION'S HOTLINES: 6754664 FOR FARMERS IN THE NORTH
FOR
LONG
OTHER 4792261 EXT. 216 DISTRICTS.
DISTRICT,
AND
8351533
FOR
AS FOR THE DEMONSTRATION PROJECTS, READY FOR DEMONSTRATION SHORTLY.
PARTICIPATING FARMS REMAINING TWO
EPD REPRESENTATIVE SAID THE
THEY
IN THE WILL BE
THE MEMBERS WERE ALSO INFORMED THAT THE CONSULTANT'S REPORT
FOR CONSULTATION IN MAY THIS THE PROJECTS IS EXPECTED TO BE READY YEAR.
ON
AFTER THE MEETING, MEMBERS OF THE STEERING KWU LING TO INSPECT THE OPERATION OF THE PIG-ON-LITTER SYSTEM.
GROUP WENT TO TA
0
/11
No comments yet.
Private notes are available after approval.