XN000022-1990-03-05 — Page 11

Daily Information Bulletin 新聞公報 All

MONDAY, MARCH 5, 1990

10

SIX FARMS COMPLETED WASTE TREATMENT DEMONSTRATION

SIX OF THE DEMONSTRATION PROJECTS

NINE PRIVATE

LIVESTOCK ON

PROJECTS

PARTICIPATING TREATMENT METHODS COMPLETED THE SIX-MONTH DEMONSTRATION PERIOD, MEMBERS OF THE

FARMS PRIVATE DEMONSTRATION ON

FARMS

WASTE

ON

THE HAVE STEERING LEARNT TODAY

IN'

GROUP

(MONDAY).

THIS AFTERNOON, REPRESENTATIVES FROM AT THE GROUP'S MEETING

ON THE THE ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) BRIEFED MEMBERS

VARIOUS TREATMENT METHODS PROGRESS OF THE DEMONSTRATION PROJECTS ON

COMPLY

LIVESTOCK FARMERS

WITH

ANTI-POLLUTION

ΤΟ WHICH CAN ENABLE REQUIREMENTS STIPULATED UNDER THE LIVESTOCK WASTE CONTROL SCHEME.

ON

TREATED SHAN, WHICH JUST COMPLETED ITS COMPLIED MONTH,

WITH THE ANTI-POLLUTION

MEMBERS LEARNT THAT ANALYSIS BY EPD CONFIRMED THAT THE EFFLUENT OF THE PIG FARM IN MA DEMONSTRATION PERIOD LAST REQUIREMENTS.

SATISFIED WITH THE OPERATION OF THE FARM OPERATOR WAS VERY

THE SYSTEM AFTER THE THE HYBRID SYSTEM, AND WOULD CONTINUE TO USE

USE OF DEMONSTRATION PERIOD. THE OPERATOR HAD ALSO SUCCESSFULLY MADE

AN EPD REPRESENTATIVE THE SLUDGE PRODUCED TO FERTILISE FRUIT TREES, ADDED.

ANOTHER PIG FARM

THE PIG-ON-LITTER WASTE TREATMENT SYSTEM IN IN TA KWU LING WAS HANDED OVER TO THE OPERATOR LAST MONTH AND AVAILABLE FOR DEMONSTRATION.

THE

GROUP, MR LEO OF THE STEERING CHAIRMAN

MADE FOR

FARMERS ARE BEING

LIVESTOCK ARRANGEMENTS CONTINUE BUSINESS IN CONTROL AREAS TO VISIT THE FARM TO SYSTEM OPERATES.

IS NOW

SAID KWAN,

TO WHO WISH SEE HOW THE

YUEN

REGISTER THEIR MR KWAN SAID INDIVIDUAL FARMERS ARE WELCOME TO

FARM WITH THE CITY AND NEW TERRITORIES INTEREST IN VISITING THE

DISTRICT, ADMINISTRATION'S HOTLINES: 6754664 FOR FARMERS IN THE NORTH

FOR

LONG

OTHER 4792261 EXT. 216 DISTRICTS.

DISTRICT,

AND

8351533

FOR

AS FOR THE DEMONSTRATION PROJECTS, READY FOR DEMONSTRATION SHORTLY.

PARTICIPATING FARMS REMAINING TWO

EPD REPRESENTATIVE SAID THE

THEY

IN THE WILL BE

THE MEMBERS WERE ALSO INFORMED THAT THE CONSULTANT'S REPORT

FOR CONSULTATION IN MAY THIS THE PROJECTS IS EXPECTED TO BE READY YEAR.

ON

AFTER THE MEETING, MEMBERS OF THE STEERING KWU LING TO INSPECT THE OPERATION OF THE PIG-ON-LITTER SYSTEM.

GROUP WENT TO TA

0

/11

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.