LA
SATURDAY, FEBRUARY 3, 1990
TEMPORARY TRAFFIC ARRANGEMENTS IN TAI KOK TSUI
THE TRANSPORT DEPARTMENT ANNOUNCES THAT TEMPORARY TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN TAI KOK TSUI FROM 10 AM ON MONDAY (FEBRUARY 51 FOR ABOUT SIX MONTHS BECAUSE OF ROAD RECONSTRUCTION WORKS.
VEHICLES OVER SIX METRES LONG WILL NOT BE ALLOWED ΤΟ ENTER EASTBOUND FUK LEE STREET BETWEEN MAN ON STREET AND TAI KOK TSUI ROAD. LONG VEHICLES ON EASTBOUND FUK LEE STREET HEADING FOR NORTHBOUND ΤΑΙ KOK TSUI ROAD ARE ADVISED TO USE MAN ON STREET AND WAI ON STREET.
BEDFORD ROAD BETWEEN MAPLE STREET AND TAI KOK TSUI ROAD WILL BE RE-ROUTED FROM TWO-WAY TRAFFIC TO ONE-WAY WESTBOUND.
BANNED:
AT THE SAME TIME, THE FOLLOWING TURNING MOVEMENTS WILL BE
* THE LEFT-TURN FROM SOUTHBOUND TAI KOK TSUI ROAD ONTO
EASTBOUND BEDFORD ROAD:
*
THE RIGHT-TURN FROM SOUTHBOUND WESTBOUND FUK LEE STREET: AND
ΤΑΙ KOK TSUI ROAD ONTO
THE RIGHT-TURN FROM EASTBOUND FUK LEE STREET ONTO SOUTHBOUND TAI KOK TSUI ROAD.
VEHICLES TRAVELLING ON SOUTHBOUND TAI KOK TSUI ROAD HEADING FOR EASTBOUND BEDFORD ROAD WILL BE DIVERTED VIA FUK TSUN STREET AND WALNUT STREET WHILE THOSE HEADING FOR WESTBOUND FUK LEE STREET WILL BE DIVERTED VIA IVY STREET, ΤΑΙ CHING STREET. ΤΑΙ TSUN STREET AND NORTHBOUND TAI KOK TSUI ROAD.
MOREOVER, VEHICLES TRAVELLING ON EASTBOUND HEADING FOR SOUTHBOUND TAI KOK TSUI ROAD ARE ADVISED STREET AND WAI ON STREET.
FUK
TO
LEE STREET USE MAN ON
TEMPORARY LANE CLOSURE ON TOLO HIGHWAY
THE TRANSPORT DEPARTMENT ANNOUNCES THAT TO FACILITATE ROAD MAINTENANCE WORKS, A SECTION OF ABOUT 1.3 KILOMETRES OF THE SLOW LANE OF TOLO HIGHWAY NORTHBOUND NEAR TAI PO TAI WO ROAD WILL BE CLOSED TRAFFIC ON MONDAY (FEBRUARY 51.
то
No comments yet.
Private notes are available after approval.