20
FRIDAY, SEPTEMBER 29, 1989
THE SECTION OF SHING MUN ROAD BETWEEN MIŲ KONG SAI LAU KOK ROAD WILL BE RE-ROUTED FROM TWO-WAY SOUTHWARD; AND
STREET AND
ΤΟ ONE-WAY
ROAD AND THE SECTION OF SAI LAU KOK ROAD BETWEEN SHING MUN
FROM TWO-WAY TO ONE-WAY WAI TSUEN ROAD WILL BE RE-ROUTED WESTWARD.
THESE ROADS WILL BE DESIGNATED URBAN CLEARWAYS 7 PM DAILY.
FROM 7 AM TO
AT THE SAME TIME, TRAFFIC ARRANGEMENTS ON WAI TSUEN BE IMPLEMENTED IN CONJUNCTION WITH THIS SCHEME.
ROAD WILL
OF WAI TSUEN ROAD THE SOUTHBOUND
THE NORTHBOUND CARRIAGEWAY OF THE SECTION BETWEEN MIU KONG STREET AND TSUEN KAM INTERCHANGE AND CARRIAGEWAY OF THE SECTION OF WAI TSUEN ROAD BETWEEN SHEK WAI KOK ROAD AND MIU KONG STREET WILL BE RE-OPENED.
OF WAI TSUEN ROAD
BE
THE NORTHBOUND CARRIAGEWAY OF THE SECTION BETWEEN MIU KONG STREET AND TSUEN KAM INTERCHANGE WILL A 24-HOUR DAILY URBAN CLEARWAY.
DESIGNATED
TRAFFIC ARRANGEMENT IN SAN PO KONG
THE TRANSPORT
*
DEPARTMENT
THAT ANNOUNCES
FROM SUNDAY THE JUNCTION KONG WILL BE
(OCTOBER 1), THE FLYOVER LEADING FROM KWUN TONG ROAD TO OF LUNG CHEUNG ROAD AND CLEAR WATER BAY ROAD IN SAN PO CLOSED FROM 9 PM TO 5.45 AM THE FOLLOWING MORNING FOR FOUR DAYS.
THE CLOSURE IS BRIDGE EXPANSION JOINTS.
NECESSARY
TO
FACILITATE
THE
MAINTENANCE
OF
FOR
DURING THE CLOSURE, ALL VEHICLES ON KWUN TONG ROAD HEADING
ROAD | INCLUDING THE JUNCTION OF LUNG CHEUNG ROAD AND CLEAR WATER BAY
80. 89. BUSES ON KMB ROUTES 3D, 5K, 6D, 11C, 15A, 38, 70X, 74X, 74A,
WILL BE 89A, 89B AND 89C, DIVERTED VIA KWUN
AND CROSS
ROAD, TONG
121),
WESTBOUND,
AND
LUNG
ROUTE HARBOUR TUNNEL
PRINCE EDWARD ROAD EAST
EAST EASTBOUND CONCORDE ROAD, FLYOVER, PRINCE EDWARD ROAD CHEUNG ROAD.
/21
No comments yet.
Private notes are available after approval.