XN000022-1989-09-01 — Page 17

Daily Information Bulletin 新聞公報 All

16

FRIDAY, SEPTEMBER 1, 1989

A FOOTBRIDGE, A SUBWAY AND A ALSO BE BUILT.

PUBLIC

TRANSPORT

TERMINUS

WILL

THE

TO THE

PERMANENT ALTERNATIVE ACCESS WILL BE PROVIDED TO CATER FOR EXISTING ACCESS THAT HAS TO BE CLOSED. DURING THE CONSTRUCTION PERIOD, TEMPORARY ACCESS WILL BE MAINTAINED SO THAT ANY INCONVENIENCE PUBLIC WILL BE MINIMISED.

NO RESUMPTION OF LAND IS INVOLVED.

BE

WILL BEEN DESIGNED AND CONSTRUCTION THE WORKS HAVE SUPERVISED BY MAUNSELL CONSULTANTS ASIA LIMITED, CONSULTING ENGINEERS, ON BEHALF OF THE TERRITORY DEVELOPMENT DEPARTMENT,

A NOTICE CONCERNING THE PROPOSED WORKS GAZETTE TODAY (FRIDAY).

WAS PUBLISHED IN THE

CENTRAL

AND CENTRAL

AT

PO

THE AT INSPECTED SCHEME MAY BE THE PLAN AND

SUB-OFFICE, ENQUIRY CENTRAL OFFICE, WESTERN DISTRICT GOVERNMENT OFFICES, WEST WING, MAIN ENTRANCE LOBBY, HONG KONG; AND THE TAI PO DISTRICT LANDS OFFICE AND TAI PO DISTRICT OFFICE AT TAI GOVERNMENT OFFICES BUILDING, TING KOK ROAD, TAI PO.

FOR TRANSPORT,

ALBERT LOWER FLOOR,

PROPOSED WORKS SHOULD

OFFICES, KONG BEFORE

SECOND

ANY PERSON WHO WISHES TO OBJECT TO THE WRITE TO THE SECRETARY

WING, EAST OCTOBER 31 THIS YEAR.

GOVERNMENT CENTRAL

HONG ROAD,

FORMATION, ROADS AND DRAINAGE WORKS FOR FANLING

THE TERRITORY DEVELOPMENT DEPARTMENT IS AS PART OF THE PROJECT

CONTINUING ANOTHER DEVELOPMENT OF FANLING/SHEUNG SHUI NEW TOWN.

THE PROJECT MAINLY COVERS SITE FORMATION,

STAGE IV AREA.

WORKS IN THE FANLING SOUTH

-

INVITING TENDERS FOR FOR THE PROGRAMME

ROADS AND DRAINAGE

OF LAND IN FANLING 250-METRE

THE PROPOSED WORKS INVOLVE THE FORMATION SOUTH AREAS 40, 48C, 49A, 49B AND 50; THE CONSTRUCTION OF A SECTION OF A LOCAL ROAD L100 AND ABOUT 700 METRES OF INTERNAL ROADS.

ROADSIDE THE NECESSARY

FOOTPATHS,

WALL,

WILL

BE

THE ROADWORKS, WITH CONJUNCTION IN

A RETAINING AMENITIES,

FURNITURE, STREET

NETWORKS SEWERAGE STORMWATER DRAINAGE AND PROVIDE INFRASTRUCTURE FOR THE NEW DEVELOPMENT AREAS.

CONSTRUCTED

ΤΟ

EXISTING PEDESTRIAN

THE WORKS ALSO INCLUDE IMPROVEMENT TO THE CROSSING FACILITIES AT THE JUNCTION OF ROADS D6 AND L100.

/WORK IS