SUNDAY, AUGUST 27, 1989
14
URBAN CLEARWAYS IN SHA TIN
ON TUESDAY THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM
WILL BE DESIGNATED URBAN (AUGUST 29). TWO ROAD SECTIONS IN SHA TIN CLEARWAYS.
EAST OF RAVANA FROM 7 AM TO MIDNIGHT DAILY, THE UNNAMED ROAD
KIU ROAD CHUNG
ΤΟ A POINT 130 GARDEN FROM ITS JUNCTION WITH TAL
THIS METRES EAST OF THE SAME JUNCTION, INCLUDING THE ROUNDABOUT ALONG SECTION. WILL BE DESIGNATED AN URBAN CLEARWAY.
THE UNNAMED ROAD EAST OF RAVANA GARDEN FROM ITS MA ON SHAN ROAD TO A POINT 220 METRES WEST OF THE SAME BE DESIGNATED A 24 HOURS DAILY URBAN CLEARWAY.
JUNCTION WITH JUNCTION
EXCEPT THOSE
WITHIN THE RESTRICTED AREAS. ALL VEHICLES, PERMITS ISSUED BY THE COMMISSIONER FOR TRANSPORT, WILL FROM STOPPING FOR PASSENGERS OR GOODS.
AT THE SAME TIME. CONNECTING TAI CHUNG KIU ROAD
ROAD EAST OF ON MA
SHAN ROAD. DESIGNATED
THE
UNNAMED
AND
ROUNDABOUT
ALONG
THIS ROAD,
WILL
TERRITORIES TAXI URBAN CLEARWAY,
BE
WILL
WITH
BE PROHIBITED
GARDEN THE
RAVANA INCLUDING
A 24-HOUR NEW
NOT BE ALLOWED
TO STOP FOR
ALL NEW TERRITORIES TAXIS WILL PASSENGERS OR GOODS WITHIN THE RESTRICTED AREA.
TRAFFIC ARRANGEMENTS IN SHAM SHUI PO
* *
TONKIN STREET
THE TRANSPORT DEPARTMENT ANNOUNCES THAT FROM 10 AM
FROM CASTLE PEAK ROAD EASTBOUND INTO (AUGUST 29), THE RIGHT-TURN
NORMAL
THE SOUTHBOUND WILL RESUME
UPON OPERATION JUNCTION OF CASTLE PEAK ROAD AND COMPLETION OF ROAD WORKS AT THE TONKIN STREET.
ON TUESDAY
BETWEEN CASTLE TO ONE-WAY SOUTHBOUND
AT THE SAME TIME. THE SECTION OF PRATAS STREET SHUN NING ROAD WILL REVERT PEAK ROAD AND OPERATION.
CONSEQUENTLY, BUSES ON KMB ROUTES NO. 35A AND 36A OPERATION VIA CASTLE PEAK ROAD, TONKIN ROAD AND CHEUNG ON JOURNEYS TO THE TERMINUS AT THE SHAM SHUI PO FERRY.
WILL RESUME
SHA WAN
ROAD
No comments yet.
Private notes are available after approval.