SUNDAY, JULY 2, 1989
13
SIGNAGE PROGRAMME FOR TUNNEL ROUTES
* * *
WORK WILL SOON BE
STARTED
TO REMOVE
THE
ON
OF A
LOGO" "TUNNEL DIRECTIONAL SIGNS ALONG THE CROSS HARBOUR TUNNEL ROUTES AS PART PROGRAMME TO PROVIDE CLEAR SIGNAGE IN ASSOCIATION WITH THE OPENING OF
THE TRANSPORT DEPARTMENT CROSSING, HARBOUR THE EASTERN
ANNOUNCED
TODAY (SUNDAY).
THIS IS TO ENSURE THAT MOTORISTS WILL NOT BE
OF POINTS LOGO WHEN REACHING THE INTERSECTING ROUTES.
CONFUSED BY THE TWO OR MORE TUNNEL
FOR CLARITY, ONLY ONE TYPE OF TUNNELS IN THE TERRITORY,
LOGO TUNNEL
IS USED
FOR ALL
IN FUTURE, THE TUNNEL LOGO WILL APPEAR ONLY ON THE SIGN AT THE LAST POINT OF ENTRY TO ANY TUNNEL.
DIRECTIONAL
A SPOKESMAN FOR THE TRANSPORT DEPARTMENT SAID THE NOW PAINTED ON DIRECTIONAL SIGNS IN VARIOUS DISTRICTS IN ON HONG KONG ISLAND WILL BE REMOVED IN THE NEXT FEW WEEKS.
SIGNS
IN ADDITION, DESTINATION NAMES SUCH AS "HONG
DIRECTIONAL KONG EAST" WILL BE PUT ON LEADING TO THE TWO CROSS HARBOUR TUNNELS.
THE
LOGO
TUNNEL KOWLOON AND
KONG" AND HONG THE ROUTES
ALONG
MOREOVER, A NUMBERING SYSTEM ROUTEING OF THE TRUNK ROUTES IN PAINTED ON THE DIRECTIONAL SIGNS TO AID MOTORISTS.
HONG
WILL BE USED ROUTE KONG.
TO NUMBERS
INDICATE
WILL
THE BE
WITH
ON WELL
AND ROUTE "THE COMBINED USE OF TUNNEL LOGO, DESTINATION NAMES
INFORMATION COMPREHENSIVE NUMBERS WILL PROVIDE MOTORISTS THEIR CHOSEN ROUTE AND ENABLE THEM TO MAKE THEIR CHOICE OF ROUTE IN ADVANCE OF THEIR DESTINATION," THE SPOKESMAN SAID.
NIGHT CLOSURE OF CHEUNG WING ROAD INTERCHANGE
THE TRANSPORT
DEPARTMENT
ΤΟ THAT ANNOUNCES
FACILITATE
THE
WILL
FLYOVER CONSTRUCTION, CHEUNG WING ROAD INTERCHANGE IN KWAI CHUNG
WILL BE TRAFFIC ARRANGEMENTS TEMPORARY AND BE PARTIALLY CLOSED
THREE DAYS FROM TUESDAY
INTRODUCED BETWEEN 1.30 AM AND 5.30 AM FOR (JULY 4).
ON TUESDAY NIGHT, KWAI CHUNG
ROAD SOUTHBOUND BETWEEN CHEUNG ROAD, AND
PEAK CASTLE
ROAD NORTHBOUND WING ROAD AND CASTLE BETWEEN LEI MUK ROAD AND KWAI CHUNG ROAD WILL BE CLOSED TO TRAFFIC.
PEAK
/VEHICLES ON ....
No comments yet.
Private notes are available after approval.