TUESDAY, JANUARY 10, 1989
13
NO-STOPPING RESTRICTIONS
THE TRANSPORT DEPARTMENT ANNOUNCED THAT SEVERAL ROAD SECTIONS WILL BE DESIGNATED URBAN CLEARWAYS FROM 10 AM ON FRIDAY (JANUARY 13).
IN CHEUNG SHA WAN, TAI NAN WEST STREET BETWEEN ITS JUNCTION WITH CHEUNG SHA WAN ROAD AND A POINT ABOUT 20 METRES NORTH OF THE SAME JUNCTION WILL BECOME A PEAK HOUR [7 AM
PM) 10 AM AND 4 PM - 7 DAILY URBAN CLEARWAY.
—
THE SERVICE ROAD OF EASTBOUND CHEUNG ITS JUNCTION WITH TAI NAN WEST STREET AND A EAST OF THE SAME JUNCTION WILL ALSO BECOME A CLEARWAY.
SHA WAN ROAD BETWEEN POINT ABOUT 20 METRES PEAK HOUR DAILY URBAN
YI,
AT THE SAME TIME, TAM KON SHAN ROAD IN TSING JUNCTION WITH TAM KON SHAN INTERCHANGE AND A POINT ABOUT NORTH OF THE SAME JUNCTION, WILL
BE DESIGNATED A PEAK URBAN CLEARWAY.
BETWEEN ITS 250 METRES HOUR DAILY
IN ADDITION, THE FOLLOWING ROAD SECTIONS IN YAU ΟΙ ESTATE. TUEN MUN, WILL BE MADE 7 AM TO MIDNIGHT DAILY URBAN CLEARWAYS:
* THE NORTHERN KERBSIDE SECTION OF ROAD E1 FROM A POINT ABOUT
50 METRES EAST OF ROAD 15A TO ITS JUNCTION WITH ROAD 15A.
* THE EASTERN KERBSIDE SECTION OF ROAD 15A FROM A POINT ABOUT
FIVE METRES NORTH OF ROAD E1 TO ITS JUNCTION WITH ROAD E1.
THE SOUTHERN KERBSIDE SECTION OF ROAD E3 FROM THE ACCESS ROAD LEADING TO THE CARPARK SOUTH OF ROAD E3 TO A POINT ABOUT 60 METRES EAST OF THE SAME ACCESS ROAD.
* THE EASTERN KERBSIDE SECTION OF THE ACCESS ROAD LEADING TO THE CARPARK SOUTH OF ROAD E3 FROM ITS JUNCTION WITH ROAD E3 TO A POINT ABOUT 10 METRES SOUTH OF THE SAME JUNCTION.
MEANWHILE, IN CENTRAL, WELLINGTON STREET BETWEEN GRAHAM AND ABERDEEN STREET WILL BE DESIGNATED A 7 AM TO 7 PM DAILY CLEARWAY FOR ABOUT THREE MONTHS FOR ROAD RECONSTRUCTION WORKS.
NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED TO FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
STREET URBAN
STOP
14
No comments yet.
Private notes are available after approval.