SUNDAY, JANUARY 1, 1989
3
TEMPORARY PARTIAL LANE CLOSURE OF TUEN MUN ROAD
THE TRANSPORT DEPARTMENT REMINDED MOTORISTS THAT TO FACILITATE ROAD RESURFACING WORK, THE THREE TRAFFIC LANES ON TUEN MUN ROAD EASTBOUND (TSING LUNG TAU BRIDGE SECTION) WILL BE CLOSED IN TURN FROM TOMORROW (MONDAY) TO JANUARY 10.
DURING THE WORK PERIOD, TWO TRAFFIC LANES WILL BE MAINTAINED ON THE AFFECTED SECTION FROM 6.30 AM TO 9
PM, WHILE AT LEAST ONE TRAFFIC LANE WILL REMAIN OPEN FROM 9 PM TO 6.30 AM.
MOTORISTS ARE ADVISED то USE THE CASTLE PEAK ROAD.
0.
ALTERNATIVE
TEMPORARY URBAN CLEARWAY IN SHEUNG WAN
*
ROUTEING
VIA
FROM
THE TRANSPORT DEPARTMENT ANNOUNCED THAT
10 AM ON WEDNESDAY (JANUARY 4) THE NORTHERN KERBSIDE LANE OF WING LOK STREET IN SHEUNG WAN BETWEEN HOUSE NOS. 164 AND 190 WILL BE DESIGNATED AN URBAN CLEARWAY ROUND-THE-CLOCK DAILY FOR ABOUT TWO WEEKS FOR ROAD RECONSTRUCTION WORKS.
NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED ΤΟ STOP FOR PASSENGERS OR GOODS THERE.
TRAFFIC ARRANGEMENT IN SAN PO KONG
* * * * *
FROM 10 AM ON WEDNESDAY (JANUARY 4), THE BACK LANE BETWEEN TAI YAU STREET AND TSAT PO STREET IN SAN PO KONG WILL BE CONVERTED EXISTING TWO WAY TRAFFIC TO ONE WAY SOUTHBOUND.
THE MOVE IS AIMED AT IMPROVING TRAFFIC FLOW IN THE AREA,
FROM
No comments yet.
Private notes are available after approval.