XN000022-1988-11-24 — Page 30

Daily Information Bulletin 新聞公報 All

29

THURSDAY, NOVEMBER 24, 1988

THE EASTBOUND LANE OF DRAKE WITH TAMAR STREET. THE GMP STREET WILL BE RELOCATED TO CENTRE.

STREET EAST OF ITS JUNCTION STOP FOR ROUTE 31 IN DRAKE HARCOURT ROAD OUTSIDE ADMIRALTY

THE NORTHBOUND LANE OF RODNEY STREET BETWEEN DRAKE STREET AND HARCOURT ROAD.

ROAD CLOSURE FOR THE INTERNATIONAL CYCLE RACE

THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE FOLLOWING ROAD SECTIONS IN SHA TIN WILL BE CLOSED TO TRAFFIC FROM 5.30 AM TO 8.50 AM ON SUNDAY (NOVEMBER 27) FOR THE HOLDING OF THE INTERNATIONAL CYCLE RACE:

THE EASTERN CARRIAGEWAY OF YUEN WO BRIDGE AND SAND MARTIN BRIDGE;

ROAD BETWEEN BANYAN

*

THE NORTHERN CARRIAGEWAY OF SAND MARTIN BRIDGE BETWEEN YUEN WO ROAD AND TAI CHUNG KIU ROAD;

THE WESTERN CARRIAGEWAY OF TAI CHUNG KIU ROAD BETWEEN SAND MARTIN BRIDGE AND BANYAN BRIDGE; AND

THE SOUTHERN CARRIAGEWAY OF BANYAN BRIDGE BETWEEN TAI KIU ROAD AND YUEN WO ROAD.

CHUNG

DURING THE CLOSURE, TRAFFIC WILL BE DIVERED. THIS INCLUDES ROUTES 48, 70, 72, 72A, 72B, 73A, 74A, 80K, 80M, 81, 81K, 82K, 84M, 85, 85A, 85K, 86, 86C, 87, 88K, 89, 89A, 89C, 89R, 170 AND 284, AND GREEN MINIBUS ROUTES 60K, 62K, 65K, 67K AND 68K. THE BUS STOPS ALONG THE CLOSED ROAD SECTIONS WILL ALSO BE SUSPENDED.

KMB

82M,

PARTIAL LANE CLOSURE OF TUEN MUN ROAD

THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE THREE TRAFFIC LANES ON TUEN MUN ROAD SOUTHBOUND AT SIU LAM BRIDGE WILL BE CLOSED IN TURN FROM NOVEMBER 27 (SUNDAY) TO DECEMBER 6 FOR ROAD RESURFACING WORKS.

DURING THE WORKS PERIOD, AT LEAST TWO OF THE TRAFFIC LANES WILL REMAIN OPEN DAILY BETWEEN 6.30 AM AND 9 PM.

MOTORISTS ARE ADVISED TO DIVERT TO THE CASTLE PEAK ROAD.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.