FRIDAY, OCTOBER 21, 1988
24
PARTIAL CLOSURE OF LION ROCK TUNNEL NORTHBOUND TUBE
LANE OF THE ΤΟ CLOSED
TRAFFIC MONDAY (OCTOBER 24)
THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE SLOW NORTHBOUND TUBE OF LION ROCK TUNNEL WILL BE 10 PM TO 5.30 AM THE FOLLOWING DAY ON BOTH TUESDAY (OCTOBER 25).
FROM
AND
KOWLOON-BOUND TUBE OF DURING THE PERIOD OF CLOSURE, THE
ΤΟ MAINTAIN TUNNEL WILL BE CONVERTED TO TWO-WAY TRAFFIC, IN ORDER TWO-LANE OPERATION FOR VEHICLES HEADING FOR THE NEW TERRITORIES.
THE
A
BE CARRIED OUT
THE MEASURE IS TO FACILITATE GRADING WORKS TO NEAR THE EXIT OF THE NORTHBOUND TUBE OF THE LION ROCK TUNNEL.
TEMPORARY LANE CLOSURES ON TOLO HIGHWAY IN TAI PO
WAI
THAT THE INTERCHANGE 24) FOR ROAD
THE TRANSPORT
REMINDED MOTORISTS DEPARTMENT INNER-MOST LANE OF TOLO HIGHWAY SOUTHBOUND NEAR SHUI IN TAI PO WILL BE CLOSED TO TRAFFIC ON MONDAY (OCTOBER MAINTENANCE WORKS.
MEANWHILE, THE INNER-MOST LANE OF TOLO HIGHWAY SOUTHBOUND
WILL
CLOSED ON NOT BE
OCTOBER 31 LAM KAM ROAD INTERCHANGE NOVEMBER 1 AS THE SCHEDULED WORKS HAVE BEEN CANCELLED.
NEAR AND
1
No comments yet.
Private notes are available after approval.