XN000022-1988-10-11 — Page 22

Daily Information Bulletin 新聞公報 All

TUESDAY, OCTOBER 11, 1988

21

NEW URBAN CLEARWAY RESTRICTIONS DESIGNATED

ΤΟ WATCH OUT THE TRANSPORT DEPARTMENT ADVISED MOTORISTS NEW URBAN CLEARWAY RESTRICTIONS IN YAU MA TEI, TSUEN WAN AND TUEN FROM 10 AM ON FRIDAY (OCTOBER 14).

THE NEW RESTRICTIONS ARE BEING DESIGNATED IN ORDER TRAFFIC FLOW.

FOR

MUN

ΤΟ IMPROVE

UNNAMED ROAD SECTIONS OF MAN SING STREET IN YAU MA TEI AND AN

URBAN CLEARWAYS IN TSUEN WAN WILL BE MADE

OPERATING DAILY BETWEEN

7 AM AND 7 PM.

STREET BETWEEN CHUNG

THEY ARE THE WESTERN KERBSIDE LANE OF MAN SING MAN CHEONG STREET AND MAN WUI STREET, AND THE UNNAMED ROAD OVER HANG NULLAH BETWEEN SHA TSUI ROAD AND CASTLE PEAK ROAD.

NORTHWESTERN KERBSIDE IN TUEN MUN, A SECTION OF THE CASTLE PEAK ROAD (LAM TEI SECTION) WILL ALSO BECOME AN URBAN OPERATING ROUND THE CLOCK.

70

THE AFFECTED ROAD SECTION RANGES FROM A POINT OPPOSITE

то A POINT ABOUT ACCESS ROAD LEADING TO SHUN FUNG WAI SOUTHWEST OF THE SOUTHERN ACCESS ROAD LEADING TO YICK YUEN,

THE EXTENT AND OPERATING HOURS OF THESE

LANE OF CLEARWAY

то THE METRES

URBAN CLEARWAYS WILL

BE INDICATED BY APPROPRIATE TRAFFIC SIGNS.

NO VEHICLES WILL BE ALLOWED TO STOP WITHIN THE URBAN FOR PASSENGERS OR GOODS DURING THE RESTRICTED HOURS.

0

TEMPORARY URBAN CLEARWAYS IN WESTERN

THE TRANSPORT DEPARTMENT

ANNOUNCED

CLEARWAYS

THAT THE FOLLOWING ROAD AM ON SECTIONS IN WESTERN WILL BE DESIGNATED URBAN CLEARWAYS FROM 10 FRIDAY (OCTOBER 14}:

CONNAUGHT ROAD WEST

THE NORTHERN KERBSIDE LANE OF HOUSE NOS. 160 AND 185 WILL BE MADE 7 AM TO 7 PM DAILY CLEARWAY.

BETWEEN URBAN

ROAD WEST FROM A * THE SOUTHERN KERBSIDE LANE OF CONNAUGHT

POINT ABOUT 55 METRES WEST OF ITS JUNCTION WITH WATER STREET A TO A POINT ABOUT SIX METRES EAST OF THE SAME JUNCTION, AND

SOUTH 10-METRE STRETCH ALONG WATER STREET

OF 1TS JUNCTION WITH CONNAUGHT ROAD WEST WILL BECOME URBAN CLEARWAYS ROUND-THE-CLOCK.

NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.

BE

ALLOWED TO STOP

THESE MEASURES WILL

IN FORCE FOR ABOUT FACILITATE ROAD RECONSTRUCTION WORKS.

BE

SIX MONTHS

TC

/22

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.