XN000022-1988-09-26 — Page 16

Daily Information Bulletin 新聞公報 All

MONDAY, SEPTEMBER 26, 1988

15

TEMPORARY URBAN CLEARWAYS ON DES VOEUX ROAD WEST

THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE FOLLOWING SECTIONS OF DES VOEUX ROAD WEST WILL BECOME 7 AM TO MIDNIGHT DAILY URBAN CLEARWAYS FROM 10 AM ON THURSDAY (SEPTEMBER 29}:

WRST

THE NORTHERN KERBSIDE LANE OF EASTBOUND DES VOEUX ROAD FROM ITS JUNCTION WITH KA ON STREET TO A POINT ABOUT 50 METRES EAST OF THE SAME JUNCTION.

*

THE SOUTHERN KERBSIDE LANE OF WESTBOUND DES VOEUX ROAD FROM A POINT ABOUT 60 METRES WEST OF ITS JUNCTION WATER STREET TO A POINT ABOUT 125 METRES WEST OF THE JUNCTION.

WEST

WITH SAME

NO VEHICLES EXCEPT FRANCHISED BUSES WILL BE ALLOWED FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.

TOP

THESE MEASURES WILL LAST FOR ABOUT THREE WEEKS ΤΟ FACILITATE CABLE-LAYING WORKS.

ROAD CLOSURES IN THE NEW TERRITORIES

MOTORISTS ARE ADVISED TO WATCH OUT FOR TEMPORARY ROAD CLOSURES IN SHA TIN AND TUEN MUN FROM WEDNESDAY (SEPTEMBER 28).

FOOTBRIDGE,

A

THE ERECTION OF A IN SHA TIN, TO FACILITATE

WILL SECTION OF SHA KOK STREET NEAR ITS JUNCTION WITH KONG PUI STREET

AM ON BE CLOSED TO TRAFFIC DAILY FROM 1.30 AM TO 5.30

SEPTEMBER 28

AND 29.

MOTORISTS HEADING FOR KONG PUI STREET WILL BE DIVERTED VIA SHA TIN WAI ROAD, TAI CHUNG KIU ROAD AND YUEN CHAU KOK ROAD.

IN TUEN MUN, THE THREE TRAFFIC LANES OF THE

BE

EASTBOUND CLOSED

ROAD

CARRIAGEWAY OF TUEN MUN

AT TING KAU BRIDGE WILL ALTERNATIVELY BETWEEN SEPTEMBER 28 AND NOVEMBER 10.

BE

MAINTAINED FOR

RASTBOUND

AT LEAST TWO TRAFFIC LANES WILL TRAFFIC THROUGHOUT THE PERIOD. MOTORISTS MAY USE THE ALTERNATIVE ROUTEING VIA CASTLE PEAK ROAD,

JOINTS.

THE MEASURE 19 ΤΟ FACILITATE THE REPLACEMENT OF EXPANSION

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.