XN000022-1988-08-26 — Page 24

Daily Information Bulletin 新聞公報 All

23

FRIDAY, AUGUST 26, 1988

THE SAND BRICKS AND THE MORTAR JOINTS ARE VERY SOFT AND ARE BADLY DETERIORATED WITH NUMEROUS VERTICAL CRACKS, PARTICULARLY AT THE WALL OPENINGS.

THE TIMBER ROOF JOISTS AND BOARDING ARE FOUND TO BE GENERALLY ROTTEN. THE WHOLE BUILDING IS CONSIDERED TO BE BEYOND REASONABLE REPAIR.

THE ADJOINING TEMPORARY STRUCTURES BUILT OF SHORT-LIVED MATERIALS ARE CONSIDERED AS LIABLE TO BECOME DANGEROUS AS THEY ARE GAINING SUPPORT FROM THE ADJACENT BUILDING AND ARE ALSO IN A VERY DILAPIDATED CONDITION.

IT IS CONSIDERED THAT THERE IS A RISK OF COLLAPSE OF THE BUILDING AND THE ADJOINING STRUCTURES. THEREFORE IT

IS NECESSARY CLOSE AND DEMOLISH ALL OF THEM IN ONE OPERATION.

MAIN TO

A NOTICE OF INTENTION TO APPLY FOR A CLOSURE ORDER IN THE SHA TIN DISTRICT COURT AT 9.30 AM ON OCTOBER 26 WAS POSTED TODAY.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.