WEDNESDAY, JULY 13, 1988
35
SPEED LIMIT CHANGE ON POK FU LAM ROAD
BK
THE TRANSPORT DEPARTMENT ANNOUNCED THAT THE SPEED LIMIT TRAFFIC SIGNS ON РОК FU LAM ROAD NEAR CLAYMORE AVENUE WILL RELOCATED FROM 10 AM ON SATURDAY (JULY 16) TO IMPROVE ROAD SAFETY.
AS A RESULT, THE SPEED LIMIT ON THE SOUTHBOUND AND NORTHBOUND CARRIAGEWAYS OF POK FU LAM ROAD FROM A POINT ABOUT 40 METRES SOUTH OF ITS JUNCTION WITH CLAYMORE AVENUE TO A POINT ABOUT 87 METRES SOUTH OF THE SAME JUNCTION WILL BE CHANGED FROM 50 TO 70 KILOMETRES PER HOUR.
SUSPENSION OF PARKING SPACES AT MURRAY BARRACKS
THE TRANSPORT DEPARTMENT ANNOUNCED THAT PARKING SPACE NOS. 20 TO 40 AND 92 TO 111 AT MURRAY BARRACKS OPEN-AIR CARPARK IN CENTRAL WILL BE SUSPENDED FROM 8 AM ON SATURDAY (JULY 16) ΤΟ MIDNIGHT THE FOLLOWING DAY (SUNDAY).
THIS MEASURE WILL FACILITATE THE ROADWORKS THERE.
TRAFFIC CHANGES IN KOWLOON
TO
THE TRANSPORT DEPARTMENT ANNOUNCED THAT
FACILITATE EMERGENCY DRAINAGE REPAIR WORK AT YUK YAT STREET IN TO KWA WAN, THE SECTION OF YUK YAT STREET BETWEEN LOK SHAN ROAD AND SHUN FUNG STREET HAS BEEN RE-ROUTED FROM TWO-WAY TO ONE-WAY EASTBOUND.
AT THE SAME TIME, NO VEHICLES WILL BE ALLOWED ΤΟ TURN LEFT FROM SHUN FUNG STREET INTO YUK YAT STREET WESTBOUND.
THE MEASURE WILL BE IN FORCE FOR ABOUT 10 DAYS COMPLETION OF THE REPAIR WORK.
UNTIL THE
MEANWHILE, IN YAU MA TEI, FROM 10 AM ON FRIDAY (JULY 15), THE EXISTING 7 AM TO 7 PM DAILY URBAN CLEARWAY RESTRICTION ON NATHAN ROAD SOUTHBOUND SOUTH OF ITS JUNCTION WITH WATERLOO ROAD WILL BE EXTENDED FOR ABOUT 15 METRES TO COVER THE WESTERN SECTION OF THE ACCESS ROAD LEADING TO YAU MA TEI AMBULANCE DEPOT.
ALL VEHICLES WILL BE BANNED FROM STOPPING CLEARWAY FOR PASSENGERS OR GOODS.
WITHIN THE URBAN
/36
No comments yet.
Private notes are available after approval.