XN000022-1988-03-19 — Page 9

Daily Information Bulletin 新聞公報 All

8

SATURDAY, MARCH 19, 1988

"IT IS HOPED THAT THROUGH MUTUAL ASSISTANCE BETWEEN NEIGHBOURS, CRIMES, PARTICULARLY BURGLARY AND THEFT, WILL BE REDUCED.

++

THE DISTRICT OFFICER, MR ALLAN CHOW, NOTED THAT THE BASIC AIM CLOSELY KNIT GROUPS

OF THE SCHEME WAS TO PROMOTE THE FORMATION OF AMONG NEIGHBOURS IN ORDER TO PREVENT CRIME.

POSITIVE EFFECTS HAD ALREADY BEEN ACHIEVED, HE ADDED.

THE CHAIRMAN OF THE DISTRICT FIGHT CRIME COMMITTEE, MR CHENG HOK-YIN, REMARKED THAT GOOD RESULTS HAD BEEN ACHIEVED IN THE FOURTH PHASE OF THE SCHEME WHICH BEGAN LAST SEPTEMBER AND INVOLVED SIX BUILDINGS.

A TOTAL OF THREE BUILDINGS ARE TAKING PART IN THE LATEST PHASE.

THEY ARE FU WING COURT, FRIENDSHIP MANSION AND HYDE PARK

MANSION.

REPRESENTATIVES OF THE BLOCKS WERE PRESENTED MEMORIAL PLATES AT TODAY'S CEREMONY.

NEW LAMBETH WALK FOOTBRIDGE OPENS TOMORROW

AN EXTENSION TO THE ELEVATED WALKWAY SYSTEM IN LAMBETH WALK AND QUEENSWAY WILL BE OPEN FROM TOMORROW (SUNDAY),

THE EXTENSION INCLUDES THE LAMBETH WALK/MURRAY ROAD FOOTBRIDGE WHICH IS SITUATED ADJACENT TO THE NORTHERN FACE OF THE MURRAY ROAD MULTI-STOREY CARPARK BUILDING AND CROSSES MURRAY ROAD TO CHATER GARDEN.

THE FASTERN END OF THIS FOOTBRIDGE IS LINKED TO BOTH THE NEW FOOTBRIDGE ACROSS LAMBETH WALK TO HUTCHISON HOUSE AND BANK OF AMERICA TOWER AND THE EXISTING FOOTBRIDGE ACROSS COTTON TREE DRIVE ΤΟ QUEENSWAY PLAZA AND BOND CENTRE.

THE EXTENSION ALSO INCLUDES A WALKWAY THROUGH THE OF THE FIRST FLOOR OF THE MURRAY ROAD CARPARK, LINKING WALK/MURRAY ROAD FOOTBRIDGE TO THE FOOTPATH ON THE FLYOVER.

WESTERN 2ND THE LAMBETH GARDEN ROAD

THE EXTENSION WAS CONSTRUCTED AS PART OF THE HIGHWAYS DEPARTMENT'S UPGRADED CONNAUGHT ROAD AND ANCILLARY ROADWORKS PROJECT.

CONSTRUCTION STARTED

$5.5 MILLION.

IN

SEPTEMBER

1986

AT

AND

COST

19

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.