(2)
(3)
+
MONDAY, FEBRUARY 8, 1988
ROAD TRANSPORT AND OF
THE NEED TO MAINTAIN PROPER PRIORITY OVER THE USE OF SPACE BY DIFFERENT MODES OF PUBLIC ALLEVIATION OF TRAFFIC CONGESTION;
THE
THE SEATING CAPACITY OF THE OPTIMISATION OF THE USE OF
WITHIN VEHICLES METRIC-TONNE NRW TYPES OF FOUR
AND THE NEED ΤΟ ENSURE COMFORT, EXISTING LEGISLATION
AND
OF PLB DRIVING
UPGRADING SAFETY AND HIGH SKILL OF SERVICES TO THE COMMUNITY; AND
(4)
HEALTHY
INTER-MODEL
TRANSPORT MODES.
COMPETITION
BETWEEN
DIFFERENT
CHEUNG SHA WAN ROAD-BOUNDARY STREET FLYOVER OPENED
OFFICIALLY
THE CHEUNG SHA WAN ROAD-BOUNDARY STREET FLYOVER WAS OPENED BY THE SECRETARY FOR TRANSPORT, MR MICHAEL LEUNG, THIS (MONDAY) MORNING.
THE 550 METRES
LONG
ONE-WAY TWO-LANE
FLYOVER EXTENDS FROM CHEUNG SHA WAN ROAD NEAR MAPLE STREET TO BOUNDARY STREET NEAR SAI YEE STREET, PROVIDING FREE FLOW TRAFFIC FROM SHAM SHUI PO TO EAST KOWLOON.
OPENING
OF THE
FLYOVER,
VEHICLES GO THROUGH CONTROLLED
EASTBOUND BEFORE THE TRAVELLING ON CHEUNG SHA WAN ROAD TO EAST KOWLOON HAD TO
SIGNAL TRAFFIC CROSSINGS PEDESTRIAN SEVERAL JUNCTIONS.
AND BUSY
WAN ROAD JUNCTION;
THE
THESE INCLUDED THE TAI PO ROAD-CHEUNG SHA THE CHEUNG SHA WAN ROAD-BOUNDARY STREET-NATHAN ROAD JUNCTION; AND BOUNDARY STREET-TUNG CHOI STREET JUNCTION.
MOTORISTS
WITH THE OPENING OF THE NEW FLYOVER FROM 2 PM TODAY,
AND ROAD JUNCTIONS WILL BE ABLE TO AVOID THESE PEDESTRIAN CROSSINGS AND CUT JOURNEY TIME BY ABOUT FOUR MINUTES DURING PEAK HOURS.
THE FLYOVER WAS DESIGNED BY THE HIGHWAYS DEPARTMENT
SUPERVISING ITS CONSTRUCTION. ALSO RESPONSIBLE FOR
CONSTRUCTION BEGAN IN JULY 1985 AND WAS COMPLETED IN MONTHS AT A COST OF $26 MILLION.
WHICH WAS
ABOUT 30
15
No comments yet.
Private notes are available after approval.