24
WEDNESDAY, JANUARY 20, 1988
RESTRICTED ZONES IN WAN CHAI
THE FOLLOWING
SECTIONS OF
HOUR
BE DESIGNATED AS PRAK
STREET IN
AND 4 PM
WAN
CHAI
—
7 PM)
WILL DAILY
ANTON (7 AM 10 AM
RESTRICTED ZONES FROM 10 AM ON SATURDAY (JANUARY 23):
* THE EASTERN SIDE OF
HENNESSY ROAD TO A POINT ABOUT 10 METRES NORTH JUNCTION; AND
ANTON
STREET FROM
ITS
JUNCTION OF THE
WITH
SAME
* THE WESTERN SIDE OF
ANTON
STREET FROM
ITS JUNCTION
WITH
HENNESSY ROAD TO A POINT ABOUT FIVE METRES NORTH OF THE JUNCTION.
SAME
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
BE ALLOWED ΤΟ
STOP
-
TEMPORARY RESTRICTED ZONE IN CAUSEWAY BAY
BETWEEN THE EASTBOUND SECTION OF HENNESSY ROAD IN CAUSEWAY BAY
AM ΤΟ MIDNIGHT DAILY HOUSE NOS. 499 AND 507 WILL BE DESIGNATED A 7 RESTRICTED ZONE FROM 10 AM ON SATURDAY (JANUARY 23).
THIS MEASURE WILL BE IN FORCE FOR ABOUT
TWO
MONTHS FOR ROAD
WORKS.
NO VEHICLES EXCEPT FRANCHISED BUSES WILL FOR PASSENGERS OR GOODS THERE.
BE
ALLOWED ΤΟ STOP
TRAFFIC CHANGES IN SHA TAU KOK
*
FROM 10 AM ON FRIDAY (JANUARY 22),
THE FOLLOWING TRAFFIC
ARRANGEMENTS WILL BE IMPLEMENTED IN SHA TAU KOK FOR ABOUT THREE MONTHS TO FACILITATE ROAD RECONSTRUCTION WORKS:
*
THE SECTION OF SHA TAU KOK ROAD (SHEK CHUNG AU BETWEEN ITS JUNCTIONS WITH ROAD L1 AND ROAD L4 WILL BE CLOSED. TRAFFIC ON SHA TAU KOK ROAD (SHEK CHUNG AU) WILL BE DIVERTED VIA ROAD L1 AND ROAD L4.
STREET
THE SECTION OF SHUN LUNG STREET BETWEEN SHA TAU KOK ROAD (SHEK CHUNG AU) AND SHA TAU KOK FIRE STATION WILL BE CLOSED. VEHICLES HEADING FOR THE SECTION OF SHUN LUNG
SOUTH OF SHA TAU KOK FIRE STATION WILL. HAVE TO TRAVEL VIA THE SECTION OF SHA TAU KOK ROAD (SHEK CHUNG AU) EAST OF ROAD L4, SHUN ON STREET AND SHUN HING STREET.
*
THE BUS TERMINUS AT SHUN LUNG STREET WILL ROAD L1 EAST OF ITS JUNCTION WITH ROAD L4. KMB ROUTE NO. 78K PLYING BETWEEN SHEUNG SHUI KOK WILL HAVE TO OPERATE VIA SHA TAU KOK ROAD AU) AND ROAD L1.
BE
RELOCATED
то
AND SHA TAU
(SHEK CHUNG
No comments yet.
Private notes are available after approval.