11
SUNDAY, NOVEMBER 1, 1987
ROAD BRIDGES BEING BUILT IN YUEN LONG
WORK ON CONSTRUCTION TWO ROAD BRIDGES IN YUEN LONG HAS STARTED FOLLOWING THE AWARD OF A $11.6 MILLION CONTRACT BY THE TERRITORY DEVELOPMENT DEPARTMENT.
THE BRIDGES ARE LOCATED AT MA WANG ROAD, OPPOSITE PING WUI STREET, AND MA MIU ROAD.
THEY ARE BOTH 13.5 METRES LONG AND EACH WILL HAVE A FOOTPATH.
WHEN COMPLETED IN 15 MONTHS, THEY WILL PROVIDE ADDITIONAL ACCESS TO YUEN LONG TOWN, THUS REDUCING THE VOLUME OF TRAFFIC TRAVELLING TO THE AREA VIA CASTLE PEAK ROAD.
TEMPORARY ROAD CLOSURE IN CAUSEWAY BAY
WILL
BAY
FROM 10 AM ON TUESDAY, NOVEMBER 3, COTTON PATH IN CAUSEWAY BE TEMPORARILY CLOSED TO ALL TRAFFIC TO FACILITATE ROAD RE-SURFACING WORK.
DURING THE PERIOD OF CLOSURE, SPECIAL ACCESS ARRANGEMENT FOR EMERGENCY VEHICLES TO ST. PAUL'S HOSPITAL WILL BE IMPLEMENTED, THE SECTION OF CAROLINE HILL ROAD Between EASTERN HOSPITAL ROAD COTTON PATH WILL BE RE-ROUTED TO TWO-WAY TRAFFIC. VEHICLES CAROLINE HILL ROAD SOUTHBOUND CAN TRAVEL VIA EASTERN HOSPITAL ROAD JOIN TUNG LO WAN ROAD.
AND AND ON TO
O
/12
No comments yet.
Private notes are available after approval.