XN000022-1987-09-23 — Page 12

Daily Information Bulletin 新聞公報 All

11

WEDNESDAY, SEPTEMBER 23, 1987

ALSO INCLUDED IN THE PROJECT WILL BE IMPROVEMENTS TO FOOTPATHS,

PO A CYCLE TRACK, AMENITY STRIPS AND ASSOCIATED WORKS IN FRONT OF TAI

IN TAI PO FIRE STATION; PAVING OF ROADS

CENTRE; AND WIDENING OF PLOVER COVE ROAD TOGETHER WITH CONSTRUCTION OF

AND FOOTPATHS

ANCILLARY DRAINAGE.

WORK IS EXPECTED TO START IN DECEMBER AND

TAKE

18 MONTHS TO

COMPLETE.

TENDERS MUST BE SUBMITTED BY NOON ON OCTOBER 9.

TRAFFIC CHANGES ON HONG KONG ISLAND

FROM 7 PM ON FRIDAY (SEPTEMBER 25), NO METRES IN LENGTH WILL BE ALLOWED TO ENTER ON DAILY FROM 7 PM TO 7 AM THE NEXT MORNING,

VEHICLE EXCEEDING 10 LAN STREET IN CENTRAL

THE MEASURE WILL BE IN FORCE FOR ABOUT ONE WEEK ΤΟ FACILITATE THE LAYING OF TELEPHONE DUCTS.

IN ADDITION, FROM 10 AM ON SATURDAY (SEPTEMBER

26), A SERIES

OF TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN ΤΑΙ HANG ΤΟ IMPROVE TRAFFIC FLOW. DETAILS ARE AS FOLLOWS:

*

*

SECOND LANE BETWEEN WARREN STREET AND JONES STREET WILL BE RE-ROUTED FROM ONE-WAY WESTBOUND TO ONE-WAY EASTBOUND.

WARREN STREET BETWEEN TUNG LO WAN ROAD AND SECOND LANE WILL BE CHANGED FROM ONE-WAY SOUTHBOUND TO ONE-WAY NORTHBOUND.

WARREN STREET BETWEEN SHEPHERD STREET AND SECOND LANE, CURRENTLY TWO-WAY TRAFFIC, WILL BECOME ONE-WAY NORTHBOUND.

JONES STREET WILL BE RE-ROUTED FROM ONE-WAY NORTHBOUND TO ONE-WAY SOUTHBOUND.

/12