XN000022-1987-08-17 — Page 8

Daily Information Bulletin 新聞公報 All

7

MONDAY, AUGUST 17, 1987

NEW REFUSE COLLECTION POINT FOR ABERDEEN

*

AT TSUNG MAN

WORK TO REDEVELOP THE REFUSE COLLECTION POINT STREET, ABERDEEN, WILL START EARLY NEXT MONTH FOLLOWING THE RECENT AWARD OF AN $825,210 CONTRACT FOR THE PROJECT.

THE NEW REFUSE COLLECTION POINT WILL BE A SINGLE-STOREY STRUCTURE WITH MEZZANINE FLOOR, EQUIPPED WITH A CARBON FILTRATION PLANT AND ELECTRICALLY OPERATED STEEL WINDOWS TO PREVENT FOUL SMELLS FROM ESCAPING.

AN ELECTRICALLY OPERATED ROLLER SHUTTER WILL BE INSTALLED AT THE MAIN ENTRANCE AND A METAL DOOR AT THE BACK ENTRANCE, WHILE THE EXTERNAL WALL WILL BE FINISHED WITH GLASS MOSAIC TILES.

FACILITIES TO BE PROVIDED WILL INCLUDE A TOILET, AND SWITCH AND STORE ROOMS ON THE GROUND FLOOR AND AN OFFICE ON THE MEZZANINE FLOOR, WITH A CONCRETE STAIRCASE LEADING TO THE BACK ENTRANCE.

THE PROJECT WILL BE COMPLETED IN EIGHT MONTHS.

0

=

ARGYLE STREET WESTBOUND CLOSED TO TRAFFIC

ROAD

ARGYLE STREET WESTBOUND UNDERNEATH THE PRINCESS MARGARET FLYOVER WILL BE CLOSED TO TRAFFIC FROM WEDNESDAY {AUGUST 19) то AUGUST 20 BETWEEN 1.30 AM AND 5.30 AM FOR THE RECONSTRUCTION OF THE FLYOVER.

MOTORISTS HEADING WEST FOR WATERLOO ROAD OR ARGYLE STREET WILL BE DIVERTED VIA PRINCESS MARGARET ROAD SOUTHBOUND, SHEUNG HING STREET AND PUI CHING ROAD. ALTERNATIVELY, THEY CAN TRAVEL VIA PUI CHING ROAD AND SOARES AVENUE TO ARGYLE STREET.

MEANWHILE, MOTORISTS WISHING TO GAIN ACCESS то THE PREMISES ALONG THE SECTION OF WATERLOO ROAD SOUTHBOUND BETWEEN ARGYLE STREET AND PUI CHING ROAD WILL BE DIVERTED VIA PRINCESS MARGARET ROAD SOUTHBOUND, SHEUNG HING STREET, PUI CHING ROAD, SOARES AVENUE, ARGYLE STREET EASTBOUND AND WATERLOO ROAD SOUTHBOUND.

18

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.