23
THURSDAY, JULY 30, 1987
TRAFFIC CHANGES IN CENTRAL
TO FACILITATE THE HOISTING OF MACHINE FOR CONSTRUCTION WORKS, HARBOUR VIEW STREET IN CENTRAL WILL BE CLOSED TO TRAFFIC DAILY BETWEEN 1 AM AND 5.30 PM FROM SATURDAY (AUGUST 1) TO MONDAY (AUGUST 3).
AFFECTED VEHICLES WILL BE DIVERTED VIA CONNAUGHT ROAD CENTRAL.
MEANWHILE, FROM 10 AM ON SATURDAY, THE EASTERN
KERBSIDE LANE OF POTTINGER STREET FROM A POINT ABOUT 25 METRES SOUTH OF ITS JUNCTION WITH DES VOEUX ROAD CENTRAL ΤΟ A POINT ABOUT 65 METRES SOUTH OF THE SAME JUNCTION WILL BE MADE A 7 AM TO MIDNIGHT DAILY URBAN CLEARWAY.
THE MEASURE WILL LAST FOR ABOUT FOUR WEEKS ΤΟ FACILITATE DRAINAGE WORKS.
WITHIN THE URBAN CLEARWAY, NO VEHICLE WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS.
AT THE SAME TIME, THE EXISTING 7 AM ΤΟ CLEARWAY RESTRICTION ON A 40-METRE STRETCH OF LANE OF POTTINGER STREET SOUTH OF ITS JUNCTION CENTRAL WILL BE LIFTED.
MIDNIGHT DAILY URBAN THE EASTERN KERBSIDE WITH DES VOEUX ROAD
TRAFFIC CHANGES IN SHEUNG WAN
ORIGINALLY ROAD WORKS,
TRAFFIC CHANGES ON HILLIER STREET IN SHEUNG WAN SCHEDULED TO COME INTO EFFECT ON TUESDAY (JULY 28) FOR HAVE BEEN CANCELLED AS A RESULT OF REVISIONS TO THE WORKS PROGRAMME.
THESE MEASURES INCLUDE TRAFFIC RE-ROUTEING AND SUSPENSION OF PARKING SPACES ALONG THE SECTION OF HILLIER STREET BETWEEN BONHAM STRAND AND JERVOIS STREET.
HOWEVER, THE SECTION OF HILLIER STREET BETWEEN BONHAM STRAND AND WING LOK STREET WILL CONTINUE TO BE CLOSED TO TRAFFIC FOR ABOUT TWO WEEKS. AFFECTED VEHICLES WILL BE DIVERTED VIA MERCER STREET, JERVOIS STREET AND MORRISON STREET.
No comments yet.
Private notes are available after approval.