12
MONDAY, JUNE 22, 1987
THE HOUSING
MEANWHILE, REPRESENTATIVES FROM BOTH
DEPARTMENT AND ARCHITECTURAL SERVICES DEPARTMENT WILL BE PRESENT TO EXPLAIN RELATED SUBJECTS TO THE MEMBERS.
NOTE TO EDITORS:
YOU ARE INVITED TO COVER THE TUEN MUN DB MEETING TOMORROW (TUESDAY) AT 9.30 AN IN THE CONFERENCE ROON OF THE DR SECRETARIAT ON THE 3/F. TUEN MUN GOVERNMENT OFFICES BUILDING, NO. 1, TUEN H1 ROAD.
NEW REFUSE COLLECTION POINT FOR ABERDEEN
THE
REFUSE
COLLECTION POINT (RCP) AT TSUNG MAN STREET, ABERDEEN, IS TO BE REDEVELOPED.
THE NEW RCP WILL BE A SINGLE-STOREY
STRUCTURE WITH MEZZANINE
FLOOR, EQUIPPED WITH A CARBON FILTRATION PLANT AND ELECTRICALLY OPERATED STEEL WINDOWS TO PREVENT THE EMISSION OF FOUL SMELLS.
AN ELECTRICALLY OPERATED ROLLER SHUTTER WILL BE INSTALLED AT THE MAIN ENTRANCE AND A METAL DOOR AT THE BACK ENTRANCE, WHILE THE EXTERNAL WALL WILL BE FINISHED WITH GLASS MOSAIC TILES.
FACILITIES TO BE PROVIDED WILL INCLUDE A TOILET, AND SWITCH AND STORE ROOMS AT THE GROUND FLOOR AND AN OFFICE ON THE MEZZANINE FLOOR, WITH A CONCRETE STAIRCASE LEADING TO THE BACK ENTRANCE.
TENDERS ARE BEING INVITED
TO CARRY OUT THE WORK WHICH EXPECTED TO START IN SEPTEMBER AND BE COMPLETED IN NINE MONTHS.
IS
/13
No comments yet.
Private notes are available after approval.