SATURDAY, DECEMBER 20, 1986
18
WHILE A MAJOR PART OF CLEVERLY STREET, AND SECTIONS OF THE SOUTHERN KERBSIDE LANE OF CONNAUGHT ROAD CENTRAL NEAR CLEVERLY STREET AND MORRISON STREET WILL BE MADE 24-HOUR DAILY URBAN CLEARWAYS, HILLIER STREET, CLEVERLY STREET NEAR WING LOK STREET, THE SOUTHERN KERBSIDE LANE OF DES VOEUX ROAD CENTRAL AND THE SOUTHERN KERBSIDE LANE OF CONNAUGHT ROAD CENTRAL NEAR MAN WA LANE AND RUMSEY STREET WILL BECOME URBAN CLEARWAYS OPERATING FROM 7 AM TO 7 PM.
IN ADDITION, A SMALL SECTION OF RUMSEY STREET NEAR ITS JUNCTION WITH WING LOK STREET WILL BE MADE A PEAK-HOUR (7 - 10 AM AND 4 - 7 PM) URBAN CLEARWAY.
CERTAIN RESTRICTIONS NOW IN FORCE IN THE AREA WILL BE RELAXED. THE EXISTING 24-HOUR DAILY URBAN CLEARWAY RESTRICTION ON THE NORTHERN KERBSIDE LANE OF DES VOEUX ROAD CENTRAL BETWEEN CLEVERLY STREET AND RUMSEY STREET WILL OPERATE ONLY FROM 7 AM TO 7 PM, WHILE THE EXISTING 7 AM TO 7 PM DAILY URBAN CLEARWAY RESTRICTION FOR ALL VEHICLES ON MAN WA LANE WILL APPLY TO GOODS VEHICLES ONLY.
WITHIN THE ABOVE URBAN CLEARWAYS. NO VEHICLES OTHER THAN FRANCHISED BUSES WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS.
NEW ROADS OPENING IN MA ON SHAN
****
FOUR NEW ROADS IN MA ON SHAN LEADING TO HANG ON ESTATE AND CHEVALIER GARDEN WILL BE OPEN TO TRAFFIC FROM 3 PM ON TUESDAY (DECEMBER 23).
THE NEW ROADS ARE MA ON SHAN ROAD, HANG SHUN STREET, HANG TAK STREET AND HANG HONG STREET.
AT THE SAME TIME, THE FOLLOWING ROAD SECTIONS IN MA ON SHAN WILL BE MADE 7 AM TO MIDNIGHT DAILY URBAN CLEARWAYS:
* TAI CHUNG KIU ROAD BETWEEN ITS JUNCTION WITH SIU
LEK YUEN ROAD AND A POINT ABOUT 100 METRES EAST OF ITS JUNCTION WITH ON SUM STREET.
*
MA ON SHAN ROAD BETWEEN ITS JUNCTION WITH HANG HONG STREET AND A POINT ABOUT 75 METRES WEST OF THE SAME JUNCTION.
*
HANG HONG STREET BETWEEN MA ON SHAN ROAD AND THE ACCESS ROAD LEADING TO HANG ON ESTATE.
Æ
HANG TAK
No comments yet.
Private notes are available after approval.