XN000022-1986-11-29 — Page 11

Daily Information Bulletin 新聞公報 All

10

SATURDAY, NOVEMBER 29, 1986

ENTRIES MAY BE PRESENTED IN CHINESE OR ENGLISH AND IN THE FORM OF ESSAYS, MODELS, PHOTOGRAPHS, DRAWINGS, SLIDES AND SOUND TAPES OR A COMBINATION OF THESE METHODS.

PRIZES IN CASH AND CERTIFICATES OF MERIT WILL BE AWARDED TO THE BEST ENTRY IN EACH GROUP.

ENTRY FORMS SHOULD BE SUBMITTED TO THE COMMERCIAL SUBJECTS SECTION, ADVISORY INSPECTORATE, EDUCATION DEPARTMENT, 523, LEE GARDENS, HYSAN AVENUE, CAUSEWAY BAY, BY MARCH 16. COMPLETED PROJECTS SHOULD REACH THE DEPARTMENT NOT LATER THAN MAY 1.

FOOTBRIDGES TO BE BUILT ACROSS WATERLOO ROAD

*****

COVERED 34-METRE FOOTBRIDGES WILL BE BUILT OVER WATERLOO ROAD, AT DERBY ROAD AND AT DURHAM ROAD, TO PROVIDE GRADE-SEPARATED PEDESTRIAN CROSSINGS.

THE FOOTBRIDGE AT DERBY ROAD WILL HAVE SPECIALLY DESIGNED RAMPS TO ASSIST PHYSICALLY HANDICAPPED PERSONS. STAIRCASES ARE

TO BE BUILT AT THE DURHAM ROAD FOOTBRIDGE.

WHEN THE FOOTBRIDGES ARE IN USE, THE PEDESTRIAN CROSSINGS ON WATERLOO ROAD AT ITS JUNCTIONS WITH LANCASHIRE ROAD AND DURHAM ROAD WILL BE CLOSED. THIS WILL IMPROVE TRAFFIC FLOW.

A DAMAGED SECTION OF LANCASHIRE ROAD BETWEEN WATERLOO ROAD AND OXFORD ROAD WILL ALSO BE RECONSTRUCTED.

THE HIGHWAYS DEPARTMENT IS INVITING TENDERS FOR BUILDING THE FOOTBRIDGES. WORK IS EXPECTED TO START IN FEBRUARY AND TAKE 15 MONTHS TO COMPLETE.

/11

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.