XN000022-1986-06-27 — Page 19

Daily Information Bulletin 新聞公報 All

FRIDAY, JUNE 27, 1986

18

1

MEASURING 6 849 SQUARE METRES, THE TUEN MUN SITE LIES TO THE SOUTH OF CHI LOK FA YUEN. THE LOWER THREE FLOORS. INCLUDING THE BASEMENT (IF ANY), OF ITS DEVELOPMENT ARE FOR NON-INDUSTRIAL PURPOSES, AND THE REMAINING FLOORS ARE FOR PRIVATE RESIDENTIAL USE.

ACCORDING TO THE BUILDING COVENANT, THE DEVELOPER HAS TO COMPLETE NOT LESS THAN 25 000 SQUARE METRES OF GROSS FLOOR AREA ON THE SITE BY SEPTEMBER 30, 1990.

ALSO FOR PRIVATE RESIDENTIAL DEVELOPMENT, THE SITE AT TAI CHUNG KIU ROAD, SHA TIN, HAS AN AREA OF 5 598 SQUARE METRES. THE DEVELOPER WILL BE REQUIRED TO BUILD AT LEAST 17 000 SQUARE METRES OF GROSS FLOOR AREA BY SEPTEMBER 30, 1990.

TENDERS SHOULD BE SUBMITTED TO THE DIRECTOR OF BUILDINGS AND LANDS BY NOON ON JULY 25.

MORE RECLAMATION PLANNED AT KWAI CHUNG

*****

RECLAMATION OF MORE FORESHORE AND SEABED OFF KWAI CHUNG IS PROPOSED IN CONNECTION WITH EXPANSION OF THE CONTAINER PORT.

DETAILS OF A PROPOSAL TO RECLAIM 5.4 HECTARES AT RAMBLER CHANNEL ADJACENT TO PILLAR ISLAND WERE GAZETTED TODAY (FRIDAY).

THE RECLAIMED LAND WILL BE USED IN EXTENDING THE NORTHERN END

OF THE CONTAINER PORT.

A SEWAGE TREATMENT PLANT WILL ALSO BE BUILT ON THE SITE.

WORK ON THE RECLAMATION IS EXPECTED TO START IN AUGUST AND DE COMPLETED BY 1988.

WRITTEN OBJECTIONS TO THE PROPOSALS SHOULD REACH THE DIRECTOR OF BUILDINGS AND LANDS BY AUGUST 26.

OTHER CONTAINER PORT EXPANSION WORK INCLUDES CONSTRUCTION OF THE CONTAINER TERMINAL NO. 6 WHICH WILL COME INTO OPERATION IN 1939. ABOUT 28 HECTARES OF LAND ARE TO BE RECLAIMED FOR THIS PROJECT.

/19

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.