TUESDAY, MAY 6, 191
J
THE SECTION OF FAIRVIEW PARK BOULEVARD BETWEEN ITS JUNCTION WITH CASTLE PEAK ROAD (TAM MI) AND A POINT ABOUT 30 METRES WEST OF THE SAME JUNCTION.
NO VEHICLES WILL BE ALLOWED TO STOP FOR PASSENGERS OR GOODS WITHIN THE RESTRICTED AREAS.
MEANWHILE, DUE TO TECHNICAL PROBLEMS, THE OPENING OF ROAD D4 NORTH, AND ROAD P2 SECTION BETWEEN ROAD D4 NORTH AND TUEN MUN ROAD, HAS BEEN POSTPONED UNTIL FURTHER NOTICE. THE TWO ROADS WERE ORIGINALLY SCHEDULED FOR OPENING ON MAY 2.
CENTRAL DISTRICT TRAFFIC ARRANGEMENTS *****
THE FOLLOWING TRAFFIC ARRANGEMENTS WILL BE IMPLEMENTED IN CENTRAL FOR ABOUT ONE MONTH FROM 10 AM ON THURSDAY (MAY 8) TO FACILITATE ROAD RECONSTRUCTION WORK:
*
VEHICLES ON WING LOK STREET WILL BE BANNED FROM TURNING INTO CLEVERLY STREET.
* VEHICLES ON WING LOK STREET HEADING FOR DES VOEUX ROAD CENTRAL WILL BE DIVERTED TO BONHAM STRAND TO REJOIN CLEVERLY STREET.
*
THE SECTION OF CLEVERLY STREET BETWEEN WING LOK STREET AND BONHAM STRAND WILL BE RE-ROUTED ONE-WAY NORTHBOUND. NO VEHICLE ON THIS SECTION OF CLEVERLY STREET WILL BE ALLOWED TO TURN LEFT INTO WING LOK STREET.
MEANWHILE, FROM 10 AM ON FRIDAY (MAY 9), THE FOLLOWING ROAD SECTIONS IN CENTRAL WILL BE MADE 24-HOUR DAILY URBAN CLEARWAYS:
* THE WESTERN KERBSIDE LANE OF TAMAR STREET FROM ITS
JUNCTION WITH HARCOURT ROAD TO A POINT ABOUT 10 METRES SOUTH OF THE SAME JUNCTION;
* THE SOUTHERN KERBSIDE LANE OF WESTBOUND HARCOURT ROAD
FROM ITS JUNCTION WITH TAMAR STREET TO ITS. JUNCTION WITH COTTON TREE DRIVE;
*
THE EASTERN KERBSIDE LANE OF COTTON TREE DRIVE FROM ITS JUNCTION WITH HARCOURT ROAD TO THE EXIT FROM THE MTR ADMIRALTY STATION (WEST) BUS TERMINUS:
* THE NORTHERN KERBSIDE LANE OF THE EXIT FROM THE MTR
STATION ADMIRALTY (WEST) BUS TERMINUS FROM ITS JUNCTION WITH COTTON TREE DRIVE TO A POINT ABOUT 15 METRES EAST OF THE SAME JUNCTION.
WITHIN THE URBAN CLEARWAYS, NO VEHICLE OTHER THAN FRANCHISED BUSES WILL BE ALLOWED TO STOP FÖR PASSENGERS OR GOODS.
No comments yet.
Private notes are available after approval.