SATURDAY, FEBRUARY 15, 1786
17
RUNNING TRACK TO BE RESURFACED
*****
THE RUNNING TRACK AT KWAI CHUNG SPORTS GROUND IS TO BE RESURFACED INTO AN ALL WEATHER TRACK.
WORK IS EXPECTED TO BEGIN IN MAY AND BE COMPLETED IN SIX MONTHS.
THE SPORTS GROUND IS THE MAIN ATHLETICS VENUE FOR KWAI CHUNG AND IS USED FREQUENTLY BY SCHOOLS IN THE DISTRICT. THE TRACK IS 400 METRES LONG.
BUS-ONLY LANES ON POK FU LAM ROAD *****
FROM 10 AM ON TUESDAY (FEBRUARY 18), THE PROHIBITION ON THE FOLLOWING SECTIONS OF THE NORTHBOUND KERBSIDE LANE OF POK FU LAM ROAD WHERE NO VEHICLE EXCEPT BUSES IS ALLOWED TO ENTER BETWEEN 7 AM AND 9 AM FROM MONDAYS TO SATURDAYS WILL BE LIFTED FOR ABOUT FOUR MONTHS:
*
*
FROM A POINT ABOUT 45 METRES NORTH OF ITS JUNCTION WITH MT. DAVIS ROAD TO A POINT ABOUT 180 METRES NORTH OF THE SAME JUNCTION; AND
FROM A POINT ABOUT 90 METRES SOUTH OF ITS JUNCTION WITH POKFIELD ROAD TO A POINT ABOUT 290 METRES SOUTH OF THE SAME JUNCTION.
HOWEVER, FROM 10 AM ON TUESDAY, VEHICLES OTHER THAN BUSES WILL BE BANNED FROM THE NORTHBOUND KERBSIDE LANE OF POK FU LAM ROAD FROM A POINT ABOUT 50 METRES SOUTH OF ITS JUNCTION WITH POKFIELD ROAD TO A POINT ABOUT 270 METRES SOUTH OF THE SAME JUNCTION BETWEEN 7 AM AND 9 AM FROM MONDAYS TO SATURDAYS.
No comments yet.
Private notes are available after approval.